Inspect for Shipping Damage
Series 322 Load Unit Installation
39
Installation
Load Unit installation consists of these four major tasks —
Inspect for Shipping Damage
Unpack and Move the Platen
Install the Crosshead Assembly
Make Connections, Bleed Lifts, Tighten Columns
Special equipment needed —
An overhead crane and lifting slings or chains capable of lifting the load unit
Torque wrenches: 322.21 – 700 lbf·ft (950 N·m) capacity
322.31 – 1400 lbf·ft (1900 N·m) capacity
322.41 – 1400 lbf·ft (1900 N·m) capacity
Molykote G-n paste
Inspect for Shipping Damage
Look for the following:
Scratches in the load unit or lift cylinder columns
Damaged electrical connections
Damaged hydraulic connections
Dents and other structural damage
Torn, kinked, or breaking hoses
Report any damage found to both the carrier and MTS. In the U.S. and Canada,
call the MTS HELPLine at 1-800-328-2255. Elsewhere, contact your local MTS
office.
Load Unit Standard Dimension Platen Weight
322.21 28 X 40 in 711 X 1016 mm 3000 lb 1370 kg
322.31 34 X 40 in 864 X 1016 mm 4500 lb 2050 kg
322.41 42 X 60 in 1067 X 1524 mm 8500 lb 3870 kg