
Maintenance Schedule – Application G roup 3A 4 – 11
4.5 Maintenance Schedule – Application Group 3A
4.5.1 Maintenance schedule
Application group
3A Continuous operation, unrestricted, load factor: 100%
Load profile
Load factor 110% 100%
Corresponding operating time 1% 99%
M015560/00E 03-05 ©MTU