Specifications

94 Preservation Specifications
Monitoring Sheet for Engines in Special Packing
Engine model: .............................. Engine No. .............................. Date of delivery: ..............................
The following checks are to be made before, during and at the end of the engine storage period and correct
execution must be confirmed by date and signature.
Note:
With new products, entry of the delivery date is mandatory.
No. Task Date Name
1
Visual check of special packing for damage
Relative humidity: .............................. %
2
Relative humidity: .............................. %
3
Relative humidity: .............................. %
4
Relative humidity: .............................. %
5
Relative humidity: .............................. %
6
Relative humidity: .............................. %
7
Relative humidity: .............................. %
8
Relative humidity: .............................. %
9
Relative humidity: .............................. %
10
Relative humidity: .............................. %
11
Relative humidity: .............................. %
12
Relative humidity: .............................. %
13
Humidity indicator check before opening the envelope
Relative humidity: .............................. %
14 Depreservation completed
15
Date of scheduled initial operation of engine
Repairs Tasks completed
To the laminated aluminum
foil or packing box
Important NOTE: Inform MTU during the warranty period:
Inform MTU
If two or all three humidity indicators are pink.
If external corrosion on the engine or damage to rubber hose connections is found when the engine
is depreserved.
Inform MTU in good time before initial operation of the engine.
A001061/33E 08-01 ©MTU
TIM ID: 0000010139 006