Specifications
94 Preservation Specifications
Monitoring Sheet for Engines in Special Packing
Engine model: .............................. Engine No. .............................. Date of delivery: ..............................
The following checks are to be made before, during and at the end of the engine storage period and correct
execution must be confirmed by date and signature.
Note:
With new products, entry of the delivery date is mandatory.
No. Task Date Name
1
Visual check of special packing for damage
Relative humidity: .............................. %
2
Relative humidity: .............................. %
3
Relative humidity: .............................. %
4
Relative humidity: .............................. %
5
Relative humidity: .............................. %
6
Relative humidity: .............................. %
7
Relative humidity: .............................. %
8
Relative humidity: .............................. %
9
Relative humidity: .............................. %
10
Relative humidity: .............................. %
11
Relative humidity: .............................. %
12
Relative humidity: .............................. %
13
Humidity indicator check before opening the envelope
Relative humidity: .............................. %
14 Depreservation completed
15
Date of scheduled initial operation of engine
Repairs Tasks completed
To the laminated aluminum
foil or packing box
Important NOTE: Inform MTU during the warranty period:
Inform MTU
• If two or all three humidity indicators are pink.
• If external corrosion on the engine or damage to rubber hose connections is found when the engine
is depreserved.
Inform MTU in good time before initial operation of the engine.
A001061/33E 08-01 ©MTU
TIM ID: 0000010139 – 006










