877-2-MUELLER www.MuellerInc.com 18'X21' DIY KIT FOR SLAB COLDFORM ENDWALL ERECTION MANUAL Mueller BYK buildings do not meet any specific code or engineering criteria. These buildings are intended to be erected in geographical locations which do not require engineered loads for buildings under 400 sq. ft.
Parts List The parts list shown in this manual is meant to be used as a reference only. Please refer to the invoice that was delivered with the kit that is being assembled. Some of the parts listed may not be required for your kit building. Also some of the colors listed may not match the kit that you purchased. For an exact parts list for your particular building please reference your invoice as it will have all data required for your building.
TRIM PAGE
36" 10" 12" 2" BUTYLTAPE LAP SCREW TEK SCREW UPN-PANEL BACK SIDE VIEW X Y X & Y Dimensions are located further in the instructions Foam Closure CORNER TRIM To avoid leaking place sealer tape between roof sheets only.
HE AD ER JT RI M COLUMN J-TRIM DOOR DOOR SHOULD BE LOWER THAN BOTTOM OF TRIM DETAIL K JT RI M J TRIM J TRIM DOOR JAMB DOOR J-TRIM NOTE FOR DOOR SIDE SHEETING ONLY: START SHEET FLUSH WITH J-TRIM ON BOTH SIDES OF DOOR
36" 10" To avoid leaking place sealer tape between roof sheets only.
A DETAIL A BB OT C HA N E EL SI D A N N H C Note: Place only one bolt where shown to connect the MKB1 clip. The other bolt will be used when installing the corner column. FB OT L FT Note: Leading and trailing edges of channel and columns are over bent for a tight fit. Spread apart as needed to nest the columns into the channel.
MAKE SURE THE ASSEMBLY IS SQUARE. ASSEMBLY IS SQUARE WHEN THE CORNER TO CORNER MEASUREMENTS ARE EQUAL. USE TEMPORARY BRACING TO HOLD ASSEMBLY SQUARE IF REQUIRED, TEMPORARY BRACING IS NOT INCLUDED.
FB JAMB COLUMN JAMB COLUMN JAMB COLUMN OT LF T D DETAIL D COLUMN BB OT C B COLUMN DETAIL C EL DE SI ANN H C C COLUMN EL DE SI ANN H C COLUMN COLUMN COLUMN COLUMN DETAIL B HA N
COLUMN JAMB COLUMN JAMB COLUMN COLUMN COLUMN COLUMN COLUMN COLUMN COLUMN DETAIL E DETAIL F E F F F DETAIL G G F
DETAIL I COLUMN COLUMN DETAIL J MG 1 2 J COLUMN 1 MG MG 3 1 MG I MG 2 J J 1 MG J MG 3 H I HE AD ER J MG 3 COLUMN NOTE: THE GIRT GOES TO THE INSIDE OF THE CLIP AS SHOWN I MG 1 MG NOTE: ONLY PUT THE BOTTOM BOLT IN LOOSELY UNTIL THE TOP SIDE CHANNEL IS INSTALLED HE AD ER 1 MG 1 MG MG 3 I
DETAIL K E EL SID ANN CH DETAIL L E EL SID ANN CH DETAIL M E EL SID ANN CH E EL SID ANN H C E EL SID ANN CH
DETAIL N DETAIL O E EL SID ANN CH FT CH OP AN COLUMN E EL SID ANN CH N COLUMN E EL SID ANN CH CN RA T FT ER COLUMN DETAIL N BT CE OP E BT CE OP E N N CN TR AF TE R O E EL SID ANN H C N FT CH OP AN O
DETAIL P LIN R PU TO PC HA N R PU " 4 L IN 8 P IN RL U "P L IN UR P 8" P P 4 P IN RL U "P
TEK SCREW UPN-PANEL DETAIL R BACK SIDE VIEW R JT DETAIL T RIM S J TRIM T 1" HE AD ER JT RI M RI M J TRIM JT J TRIM START SHEET 3/4" PAST THE END OF THE FRAME AND 1" FROM THE BOTTOM OF BASE COLUMN DETAIL S J TRIM 3 4" NOTE: IF A FLOOR KIT WAS PURCHASED PLEASE ADD THE KIT PRIOR TO SHEETING. THE INSTRUCTIONS CAN BE FOUND ON P.24 & P.
CORNER TRIM CORNER TRIM CORNER TRIM CORNER TRIM DETAIL U U
36" Foam Closure VE EA 10" IM TR LAP SCREW 12" BUTYLTAPE To avoid leaking place sealer tape between roof sheets only.
W CUT LINE CUT LINE DETAIL W
SKY LIGHT FOAM CLOSURE ROOF PANEL TEK SCREW DETAIL X X
FRAMED OPENING IS 5'-10"x6'-5" WHEN INSTALLED PROPERLY THE OPEN HEIGHT OF THE DOOR IS 6'-1" 8'-2" 8'-11" 6'-5" KIT COMES WITH A MUELLER 5'-9 12"x 6'-5" M250 ROLL UP DOOR 5'-10"