6x9 D.I.Y. Greenhouse Instructions Mueller D.I.Y. buildings are not engineered structures and do not meet any specific building code criteria. 877-2- MUELLER • www.muellerinc.
Mueller Mueller Inc Inc ‐ 6 x 9 DIY Back Yard Kit Instructions; Instructions; For For additional additional information, information, see see the the D.I.Y D.I.Y Installation Installation Video Video PG 2 Mueller, Inc. 6 x 9 D.I.Y. Greenhouse Instructions st parTs LIsT ng improvements, please refer to the parts list on the itemized invoice delivered with your building. All ciled on the inside ofRefer the channel, purlin, and rafters.
Mueller, Inc. 6 x 9 D.I.Y. Greenhouse Instructions Types of screws Skylight Screw “Large Head” TEK Screw For attaching sheet metal to purlin Lap TEK Screw For attaching sheet metal to sheet metal ⅞" 1 ¼" ¾" 36" 12" Lap TEK Screw Skylight Screw 12" 12" Lap Strap “on the bottom” Skylight Screw Skylight Screw Skylight Screw Skylight Screw Skylight Screw NOTE: Make sure to use TEK screws to attach sheets to purlins, lap TEK screws to attach sheets to sheets.
Mueller, Inc. 6 x 9 D.I.Y. Greenhouse Instructions Base layout (bc-1 and BP-1) STEP 1 Insert BP-1 into BC-1 STEP 2 Add MKB-1 (Galvanized MKB-2) to top of BP-1 into BC-1 NOTE: Leading and trailing edge of channels are overbent for a tight fit. Spread apart as needed to nest the purlin into the channel. BP-1 (Base Purlin) BC-1 (Base Channel) BP-1 (Base Purlin) Leveling and proper blocking is critical for the base layout.
Mueller, Inc. 6 x 9 D.I.Y. Greenhouse Instructions Make sure the assembly is square NOTE: Mueller recommends the building be placed on leveling blocks (not included) to support the base channel and purlins. Mueller also recommends the building be anchored to the ground or foundation. The method of anchor is at the owner’s discretion. Make sure the assembly is square. Assembly is square when the corner to corner measurements are equal.
Mueller, Inc. 6 x 9 D.I.Y. Greenhouse Instructions Erecting Columns (C-1) Attach column to MKB-1 (Galvanized MKB-2) clip using 1/2"x1" Fin Head Bolts HINT: Add clips to top of columns before standing up.
Mueller, Inc. 6 x 9 D.I.Y. Greenhouse Instructions Rafters (R-1) R-1 Bolts should remain loose until EC-1 is installed Place one bolt as shown.
Mueller, Inc. 6 x 9 D.I.Y. Greenhouse Instructions Eave Channel (EC-1) Tighten bolts after EC-1 is installed.
Mueller, Inc. 6 x 9 D.I.Y. Greenhouse Instructions Make sure the assembly is square and level 9 R-1 EC-1 C-1 R-1 EC-1 C-1 BP-1 C-1 BC-1 C-1 BP-1 BC-1 Make sure the assembly is square. Assembly is square when the corner to corner measurements are equal. Use temporary bracing (not included) to hold assembly square if required.
Mueller, Inc. 6 x 9 D.I.Y.
Mueller, Inc. 6 x 9 D.I.Y.
Mueller, Inc. 6 x 9 D.I.Y. Greenhouse Instructions Adding Mid-Girts (MG-1, MG-2 and MG-3) NOTE: Bolt to inside of column leg -1 MG MG MG -2 MKB-1 Clip -2 -1 MG -3 MG -3 MG MG -2 -3 MG NOTE: Add MKB clips to MG-2 prior to connecting to the column. TEK Screws To attach MG-3, use TEK screws to go through door trim, door frame and girt.
Mueller, Inc. 6 x 9 D.I.Y. Greenhouse Instructions Eave Trim Add Window Lap TEK Screw Start sheet 1" in from steel line. Sheet 1" above bottom of base channel Use inside/outside closures behind drip trim DripTrim NOTE: Sheets below window will need to be field cut for window assembly from 3'8" panels. Install one full sheet, then partial sheet. Insert window and flap flush to sheet. Add drip edge window trim when installing eave trim. See installation instructions included with the window packaging.
Mueller, Inc. 6 x 9 D.I.Y.
Mueller, Inc. 6 x 9 D.I.Y. Greenhouse Instructions Top View Endwall Sheeting Sidewall without door Sidewall Inside closure goes on the bottom and outside closure goes on top.
Mueller, Inc. 6 x 9 D.I.Y. Greenhouse Instructions Sheeting Sidewall without door Sidewall Top View Endwall Inside closure goes on the bottom and outside closure goes on top.
Mueller, Inc. 6 x 9 D.I.Y. Greenhouse Instructions Sheeting NOTE: Make sure the frame is plumb and level, and tighten all bolts prior to sheeting. Repeat for each wall. TOP VIEW Door Jamb Door J-Trim Panel TEK Screw NOTE: For side with door, start sheets flush with J-trim on both sides of the door.
Mueller, Inc. 6 x 9 D.I.Y.
Mueller, Inc. 6 x 9 D.I.Y. Greenhouse Instructions Back Side Wall Roof to wall sheet alignment Align major ribs from wall to major rib on roof NOTE: Make sure panels remain square during installation.
Mueller, Inc. 6 x 9 D.I.Y. Greenhouse Instructions 36" 12" Sheeting the roof Lap TEK Screw Align roof sheets with wall sheets Skylight Screw 12" 12" Lap Strap “on the bottom” Skylight Screw Skylight Screw Skylight Screw Skylight Screw Skylight Screw Skylight Screw Inside Closure NOTE: Use TEK screws at the purlins Eave Trim Use Lap TEK screws every 20" vertically Top View 2.
Mueller, Inc. 6 x 9 D.I.Y. Greenhouse Instructions Lap Strap "on the bottom" Roofing TRim details Install Foam Closures CAUTION: Use scaffold boards (not included) for support while installing roof sheets and trim.
Mueller, Inc. 6 x 9 D.I.Y. Greenhouse Instructions 22 Skylight Ridge Roll Installation CAUTION: Use scaffold boards (not included) for support while installing roof sheets and trim HINT: Screw corner of ridge roll and middle first to maintain pitch. Install remainder of screws. Foam Block (under Ridge Roll) Install lap screws on ridge roll every 12 inches Outside Closure Foam Block closes the gap in between the closures.
Mueller, Inc. 6 x 9 D.I.Y.