Installation Guide

STAPLE DOWN INSTRUCTIONS
Notes:
Staple Down
Proper location for Staple
Trim pieces available from your Mullican Flooring Distributor.
POST OF),&(%2;:22'/<152$'
JOHNSON CIT<T1
Engineered Flooring
Staple Down Installation
$TTENTION
Inspect $// materials carefully %()25(installation. Warranties DO NOT
cover materials with visible defects once they are installed.
It is the responsibility of the installer/owner to determine if the job site
subfloor and job site conditions are environmentally and structurally
acceptable for wood floor installation. Mullican Flooring declines any
responsibility for wood floor failure resulting from or connected with subfloor,
subsurface, job site damage or deficiencies after hardwood flooring has been
installed.
ST$P/('2:1,NST$//$TION
Tools: 3/8 and 1/2 thick products can use a 1 1/4 or 1 1/2 inch 18 gauge
staple, 7/32 or 1/4 inch crown or 1 1/4 inch 20 gauge cleat. 9/16 and 5/8
thick products can use a 1 1/2 inch 18 gauge staple. Cleat should be 1 3/4
inch 18 gauge cleat. Do not use staples or nails intended for 3/4 inch
solid flooring products.
Wood type subfloors should also be checked for moisture using a reliable
moisture meter.Wood or plywood subfloors should not exceed 14% moisture
content, the moisture content difference between hardwood flooring and
subfloor should not exceed 4%. Check with your local distributor for your
geographical variances.
68%)/225
 ´PLQLPXPWKLFNQHVVSUHIHUUHG´RUWKLFNHUSO\ZRRG installed
with long edges at a right angle to the 16” on center floor joists and
staggered so that the end joints in adjacent panels break over different
joists. Nail at each bearing with 6d threaded or 8d common nails spaced
10” on center along intermediate joists.
 ´[´WR´ZLGHVTXDUHHGJHNLOQGULHGFRQLIHURXVOXPEHU, laid
diagonally over 16” on center wooden joists. The ends of all boards are
to be cut parallel to the center of the joists for solid bearing. Face nail
each board solidly at every bearing on the joists with two nails (7d
threaded or 8d common).
 ´PLQLPXP26%RQLQFKPLQLPXP center floor joists with
system properly nailed or minimum 7/8” subfloor with 24” on center floor
joists or trusses.
Baseboards should be installed so that their lower edge is slightly above
the level of the finished floor, but not nailed into the finished floor.
Basement and crawl spaces must be dry and ventilated when plank or
strip flooring is to be installed over them. In crawl spaces a vapor barrier
should be provided. Black vapor barrier must be provided below
subfloor on the
ground. (6 mil. black)
Subfloor should be flat or made to be flat to 3/16” in a 8’ ft. radius.
Particle board of any thickness is NOT ALLOWED!
Adequate and proper nailing as well as soundness of the subfloor
should be ascertained. Foreign material shall be removed from the
subfloor surface and swept clean.
The clean subfloor shall be covered wall to wall with 15lb. asphalt
saturated felt, Aquabar
®
B(12526,13$3(5), or Mullican Moisture
Mat. Butt the edges when positioning one or the above mentioned
moisture retarder. Double the felt around heat ducts that may be in the
floor.
General Staple Down Installation Instruction:
Time at which to install hardwood flooring: Lay only after sheetrock and
tile work are thoroughly dried and all but the final woodwork and trim
have been completed. The building interior should have been dried and
seasoned and a comfortable working temperature (at least 60° F) and a
relative humidity of 35 – 55% should exist during and after installation.

DO NOT open until ready to install.
Preparation of subfloor: Subfloor irregularities and undulation may
cause any wood flooring installation to develop hollow spots between
the flooring and subfloor. These hollow spots are NOT the result of any
wood floor manufacturing defect and are NOT covered by the Mullican
Flooring warranty.
Adequate and proper stapling as
well as soundne
ss of the
subfloor should be ascertained. Foreign material shall be
re
moved from the subfloor surface and swept clean.
The clean subfloor surface shall be covered, wall to wall, w
ith
15 lb aspha
lt saturated felt, Aquabar
®
B, or Mullican moisture
mat (
12526,13$3(5. Butt the edges of this felt w
hen
positionin
g it.
Laying direction for plank flooring: Flooring should be laid
at
right angles to the floor joists and, if possible, in the direction
of the longest
dimension of the room.
Note: Normally, expansion space around the room should be the
same distance as the thickness of the hardwood flooring.
The floor should be installed from several cartons at the same
time to ensure color and shade mix.
End joi
nts should never be closer than 4” from each other.
Staple Engineered Plank Hardwoo
d Flooring: The first and
last row of flooring should be face nailed and filled,as well as
staples placed at Tongue. Staple or Nail (cleat) each board
along the tongue every 4 to 6 inches apart and within 2 inches
of each end joint. This should be done to the entire floor.
To avoid movement in
hardw
ood floor relative
hu
midity should be
ma
intained year round
at 35-55%. Temperature
should be kept between
68°F-78°F year round.
The use of matching
wood flooring putty to
cover small cracks or
face nail holes should
be considered norm
al in
hardw
ood flooring
insta
l
lation.
5DGLDQW+HDW6XEIORRUV2$.21/<±6He instructions on reverse
SDJHGlue Down InstallatLRQRUgo to: www.mullicanflooring.com
)/O$TING INST$//$TION
3/8”, 9/16“, 5/8” or ½” prod
NOTE:
** Do not use any type of tape on the hardwood finish surface. If a
covering is needed after installation the wood floor should be completely
covered and covering taped to itself, not the finish of wood flooring.
uct 3” width or wider can be floated in
some, not all, installations. If necessary call your supplier for details
or go to: www.mullicanflooring.com
"61/9 5/8"
14mm 15mm
3/8" 1/2"
10mm 12.7mm
M-2 04/09/15

Summary of content (2 pages)