Product Manual
page 26 — ga3.6HR
OPERATION
11. Read voltmeter on front panel of generator (Figure 22)
and verify that 120 VAC is displayed. Using an external
voltmeter as shown in Figure 22, verify that 120 VAC
is present at the 120V twist-lock and GFCI duplex
receptacles.
Figure 22. 120V Twist-Lock/GFCI Receptacles
12. Place the full power switch (Figure 23) in the 240/120V
position (down).
Figure 23. Full Power Switch 240/120V Position
(Down)
120V
OFF
V~
V
300 mV
A
A~
V
COM
120 VAC
GFCI
L5-30R
120
V
G
W
120V
AC
X
DOWN
240/120V
13. Read voltmeter on front panel of generator (Figure 24)
and verify that 240 VAC is displayed. Using an external
voltmeter as shown in Figure 24, verify that 240 VAC is
present at the 120/240V, L14-30R twist-lock receptacle.
Figure 24. 120/240V L14-30R Receptacle
14. Connecting of loads (power tools, lighting etc.) to the
generator receptacles can now be done.
240
V
OFF
V~
V
300 mV
A
A~
V
COM
240 VAC
L14-30R
240VAC
G
Y
X
W
120VAC
G
Y
X
W
120VAC
120VAC
L14-30R
NOTICE
When using a combination of dual receptacles, total
load should not exceed the rated capacity of the
generator.