OPERATION AND PARTS MANUAL STRUCTURAL CONCRETE PUMP © COPYRIGHT 2004, MULTIQUIP INC. MODEL ST-45HRM CE (HATZ ENGINE) Revision #0 (02/23/04) MULTIQUIP (UK) HANOVER MILL FITZROY STREET ASHTON-UNDER-LYNE LANCASHIRE, OL7 OTL UNITED KINGDOM PH. 0161-339-2223 FAX.
Proposition 65 Warning Thank you for your purchase of the Mayco/Multiquip ST45 concrete pump. It has been engineered and designed for maximum performance and safety. For long service life and improved reliability, please follow all safety, operating and maintenance instructions referenced in this manual. This concrete pump is to be soley used for the pumping of concrete and is not intended for any other purpose. The pumping of flammable or combustable materials is strictly prohibited.
TABLE OF CONTENTS MAYCO ST-45HRM CE CONCRETE PUMP Here’s how To Get Help.............................................2 Table of Contents ......................................................3 Pump Specifications ..................................................4 Engine Specifications ................................................5 Dimensions .............................................................. 6 Noise Measurement ..................................................
ST-45HRM CE CONCRETE PUMP — PUMP SPECIFICATIONS Table 1. ST-45 Pump Specifications Pumping Method Reciprocating Piston Pumping Rate Up to 34.4 cu. meters per hour* (45 cu. yds. per hour*) Maximum Aggregate Size 38mm (1-1/2 in. minus) Ver tical Pumping Height Up to Excess of 76m (250 ft.) Horizontal Pumping Distance 305m* (1000 ft.) Cylinder Lubrication Box Capacity 26.
ST-45HRM CE CONCRETE PUMP— ENGINE SPECIFICATIONS Table 2. Engine Specifications E n g in e Model HATZ 3M41 57HP DIESEL ENGINE Bore X Stroke 102 x 105 mm (4.02 in. x 4.13 in.) Compression Ratio 18.7 Displacement 2,573 cc (157 cu. in) Lube Oil Capacity Max/Min (8.6 L / 5.1 L) 9.1 qt. / 5.4 qt.
ST-45HRM CE CONCRETE PUMP— DIMENSIONS TABLE 3. DIMENSIONS REF. DIMENSIONS A 45 in. (114.3 cm.) B 162 in. (411.5 cm.) C 24 in. (61 cm.) D 73 in. (185.4 cm.) E 68 in. (172.2 cm.) Figure 1. ST-45HRM CE Concrete Pump Dimensions PAGE 6 — MAYCO ST-45HRM CE PUMP — OPERATION & PARTS MANUAL — REV.
ST-45HRM CE CONCRETE PUMP— NOISE MEASUREMENT EC Declaration of Conformity In accordance with EN 45014:1998 We of Multiquip (UK) Ltd Hanover Mil, Fitzroy Street Ashton Under Lyne OL7 0TL declare that: Equipment Concrete conveying and spraying apparatus Model name/number (S/N’s 220704 and 220705) Is in accordance with the following directives: 98/37/EC 89/336/EEC 2000/14/EC The Machinery Directive Electromagnetic Compatibility Directive The noise Emission in the Environment by Equipment for Use Outdoo
ST-45HRM CE CONCRETE PUMP— SAFETY MESSAGE ALERT SYMBOLS FOR YOUR SAFETY AND THE SAFETY OF OTHERS! Safety precautions should be followed at all times when operating this equipment. Failure to read and understand the Safety Messages and Operating Instructions could result in injury to yourself and others. NOTE This Owner's Manual has been developed to provide complete instructions for the safe and efficient operation of the Multiquip Mayco ST-45HRM CE Structural Concrete pump.
ST-45HRM CE CONCRETE PUMP— SAFETY MESSAGE ALERT SYMBOLS Accidental Starting ALWAYS place the ON/OFF switch in the OFF position. NEVER perform maintenance on the unit with the ignition key in the ON position. Over Speed Conditions NEVER tamper with the factory settings of the engine governor or settings. Personal injury and damage to the engine or equipment can result if operating in speed ranges above maximum allowable.
ST-45HRM CE CONCRETE PUMP— RULES FOR SAFE OPERATION CAUTION: Failure to follow instructions in this manual may lead to serious injury or even death! This equipment is to be operated by trained and qualified personnel only! This equipment is for industrial use only. The following safety guidelines should always be used when operating the MAYCO ST-45 concrete pump: GENERAL SAFETY ■ DO NOT operate or service this equipment before reading this entire manual.
ST-45HRM CE CONCRETE PUMP — RULES FOR SAFE OPERATION ■ ALWAYS remove the ignition key when leaving the pump unattended. Transporting ■ ALWAYS shutdown engine before transporting the pump. ■ ALWAYS block the wheels on the unit when using on a slope. ■ Tighten fuel tank cap securely and close fuel valve to prevent fuel from spilling. ■ ALWAYS maintain this equipment in a safe operating condition at all times. ■ Drain fuel when transporting pump over long distances or bad roads.
ST-45HRM CE CONCRETE PUMP— RULES FOR SAFE OPERATION Battery The battery contains acids that can cause injury to the eyes and skin. To avoid eye irritation, always wear safety glasses. Use well insulated gloves when picking up the battery. Use the following guidelines when handling the battery: Emergencies 1. DO NOT drop the battery. There is the possibility of risk that the battery may explode. ■ ALWAYS know the location of the nearest and first aid kit.
ST-45HRM CE CONCRETE PUMP— OPERATION AND SAFETY DECALS Machine Safety Decals The ST-45 structural concrete pump is equipped with a number of safety decals. These decals are provided for operator safety and maintenance information. Figure 1 below illustrates these decals as they appear on the machine. Should any of these decals become unreadable, replacements can be obtained from your dealer. Figure 1. ST-45 Operation and Safety Decals MAYCO ST-45HRM CE PUMP — OPERATION & PARTS MANUAL — REV.
ST-45HRM CE CONCRETE PUMP— OPERATION AND SAFETY DECALS Figure 2. ST-45 Operation and Safety Decals PAGE 14 — MAYCO ST-45HRM CE PUMP — OPERATION & PARTS MANUAL — REV.
ST-45HRM CE CONCRETE PUMP— OPERATION AND SAFETY DECALS Figure 3. ST-45 Operation and Safety Decals MAYCO ST-45HRM CE PUMP — OPERATION & PARTS MANUAL — REV.
ST-45HRM CE CONCRETE PUMP— IMPORTANT HAND SIGNALS Figure 4 display's the basic hand signals commonly used in concrete pumping operations. Figure 4 Operation Hand Signals PAGE 16 — MAYCO ST-45HRM CE PUMP — OPERATION & PARTS MANUAL — REV.
ST-45HRM CE CONCRETE PUMP— GENERAL INFORMATION Concrete Mix Design There are four ways in which this seal can be lost: Mix design is most important to achieve maximum pumpability. Pumpability is affected by, among other factors, the type and gradation of aggregate used. Natural aggregates make a more workable mix and pump more readily than crushed aggregates. A blend of natural and crushed aggregates will produce a workable mix.
ST-45HRM CE CONCRETE PUMP— GENERAL INFORMATION Regional Differences Concrete is made by mixing locally available rock and sand with cement and water. For this reason there are great differences in the pumpability of concrete from one region of the country to another. It is impossible to define a specific mix for each region that the Model ST-45 be will working in. Therefore, the mixes on pages 64-65 will provide a basic guideline for establishing the proper mix design for your area.
ST-45HRM CE CONCRETE PUMP— HOW IT WORKS The following is a brief explanation of how the concrete cylinders, hydraulic cylinders, shuttle tube, valves and hopper work in sequence to pump concrete. The hydraulic pressure is generated by a variable volume, pressure compensated, axial piston pump that is driven by a diesel engine. The rod sides of the drive cylinders are hydraulically connected together creating a “slave circuit,” which allows hydraulic oil to transfer from one piston to the other.
ST-45HRM CE CONCRETE PUMP— PUMP COMPONENTS Figure 7. Major Pump Components PAGE 20 — MAYCO ST-45HRM CE PUMP — OPERATION & PARTS MANUAL — REV.
ST-45HRM CE CONCRETE PUMP— PUMP COMPONENTS Figure 7 illustrates the location of the major components for the ST-45 Structural Concrete Pump. The function of each component is described below: 1. Tow Hitch Coupler – See the Towing Information section in this manual. 2. Documentation Box – Contains engine and pump operation, parts and maintenance information. 3. Hydraulic Oil Tank/Cap– Remove cap to add hydraulic fluid.
ST-45HRM CE CONCRETE PUMP— CONTROL BOX COMPONENTS Figure 8. Pump Control Box Components 1. Engine Tachometer – Monitors the engine RPM’s and hours of operation for the engine. 2. Emergency Stop Button – Press emergency stop button to stop pump in an emergency. Turn knob counter clockwise to disengage the stop button. 3. Hourmeter – Display's the number of hours the pump has been in use. 4. Ignition Switch – Insert the ignition key here to start the engine.
ST-45HRM CE CONCRETE PUMP— ENGINE COMPONENTS Figure 9. Pump Control Box Components INITIAL SERVICING The pump's engine (Figure 9) must be checked for proper lubrication and filled with fuel prior to operation. Refer to the manufacturers Engine manual for instructions & details of operation and servicing. 1. Muffler – Used to reduce noise and emissions. NEVER touch the muffler while it is hot! Serious burns can result. NEVER operate the engine with the muffler removed. 2.
ST-45HRM CE CONCRETE PUMP— OPERATING PROCEDURES OPERATING SUGGESTIONS C. If it is necessary to wait 10 minutes or more for another load of concrete, it is wise to start the pump and pump 6 or 8 strokes every 5 minutes to prevent setting of the mix in the system. If waiting time is excessive, it would be wise to wash out the pump and hoses and start over when the new truck arrives. 1.
ST-45HRM CE CONCRETE PUMP— OPERATING PROCEDURES WARNING B. MBVR – air entraining, acts as a lubricant. Common sense tells us that if you drive a truck into a brick wall, something is going to be damaged. The same holds true with your concrete pump. If you repeatedly pull the throttle all the way out and try to force your pump to push through blockages due to separation of material in the hose or manifold, you will soon have breakdowns and costly repairs which are not covered under warranty.
ST-45HRM CE CONCRETE PUMP— OPERATING PROCEDURES C. Mix the prime to the consistency of a smooth batter. D. Position the first ready-mix truck at the hopper. Check the concrete. DO NOT discharge concrete into hopper at this time. The bentonite is not compatible with concrete. DO NOT pump it into the forms. Discharge it out of the formed area. NOTE 16. The shuttle tube is plugged if volume at the discharge end of the hose stops, the hose is soft and the hydraulic oil pressure gauge reads 20.
ST-45HRM CE CONCRETE PUMP— OPERATING PROCEDURES D. Carefully knock the end of the hose away from the reducer. E. Chip the concrete out of the reducer with the pry bar. F. Remove the reducer. From the discharge end, chip the concrete out of the shuttle tube with the pry-bar. If concrete cannot be loosened from the outlet of the shuttle tube, remove the clean-out plug on the bottom of the hopper to discharge the concrete. G.
ST-45HRM CE CONCRETE PUMP— OPERATING PROCEDURES 19. Vertical Pumping – When pumping vertically up the side of a building, above 12.2 meters (40 feet), we would recommend the installation of steel pipe securely fastened at intervals as necessary to support the pipe. Ninety degree, long radius pipe sweeps should be installed at the top and bottom of the steel line. Use a 7.62 meter (25 ft.
ST-45HRM CE CONCRETE PUMP— INSPECTION CAUTION NEVER operate the pump in a confined area or enclosed area structure that does not provide ample free flow of air. FUEL CHECK 5. Read the fuel sight tube (Figure 10) on top of the fuel tank to determine if the pump's engine fuel is low . ALWAYS wear approved eye and hearing protection before operating the pump . NEVER place hands or feet inside the hopper. ALWAYS shutdown the engine before performing any kind of maintenance on the pump.
ST-45HRM CE CONCRETE PUMP— INSPECTION ENGINE OIL CHECK 7. Remove the engine oil dipstick from its holder (Figure 12). 12 The oil listed in Table 4 is recommended to ensure better engine performance. Use class CD or higher grade motor oil. Figure 12. Engine Oil Dipstick 8. Make sure pump is placed on level ground. 9. Pull the engine oil dipstick (Figure 13) from its holder. Hydraulic Oil 13.
ST-45HRM CE CONCRETE PUMP— INSPECTION 14. If the hydraulic oil level is low, remove the cap just above the oil level sight glass (Figure 15) and add the correct amount of hydraulic oil to bring the hydraulic oil level to a normal safe operating level. (Use Shell oil Tellus 68 or Mobil oil DFE26). 16. Remove the cotter pin from the handle tee bolt eye, and then pull the handle tee to release the stabilizer stand (Figure 17). 17.
ST-45HRM CE CONCRETE PUMP— INITIAL START-UP PROCEDURE IGNITION SWITCH STARTING CAUTION : 3. To start the engine, insert the key (Figure 20) into the ignition switch and turn the key to the ON position. DO NOT attempt to operate this concrete pump until the Safety, General Information and Inspection sections have been read and understood. EMERGENCY STOP SWITCH 1. There are 2 emergency stop switches (Figure 19).
ST-45HRM CE CONCRETE PUMP— INITIAL START-UP PROCEDURE CONTROL SWITCH 5. Turn the Pump Control switch (Figure 22) to the “ON” position, a thumping sound (cylinder stroke) should be heard. The thumping sound represents the number of strokes per minute (volume) of the pump. Figure 22. Pump Control Switch 6. Turn the Volume Control (Figure 23), lock nut counterclockwise (CCW) to release the volume control knob. 8.
ST-45HRM CE CONCRETE PUMP— INITIAL START-UP PROCEDURE ENGINE SPEED 10. Turn the Operation Pump/Engine switch to the “ENGINE” position (Figure 28). 13. Make sure the Operation Pump/Engine switch is in the “ENGINE“ position (Figure 28), and that only the engine is running. Figure 28. Operation Pump Engine Switch 14. Turn the fan switch (Figure 30) to the “ON“ position and listen for fan to start. Figure 30. Fan On/Off Switch The pump should not be cycling at this time. Only the ENGINE should be running.
ST-45HRM CE CONCRETE PUMP— INITIAL START-UP PROCEDURE C. Push the Hopper Remixer Control lever “DOWNWARD“ (Figure 32) and observe that the blades (Figure 33) inside the hopper are turning in a clockwise direction (forward). Figure 35. Handheld Remote Cable Unit Figure 33. Hopper Remixer Blades (Rotation) CYLINDER LUBRICATION BOX WARNING D.
ST-45HRM CE CONCRETE PUMP— TRAILER SAFETY GUIDELINES Tires/Wheels/Lug Nuts Tires and wheels are a very important and critical components of the trailer. When specifying or replacing the trailer wheels it is important the wheels, tires, and axle are properly matched. CAUTION DO NOT attempt to repair or modify a wheel. DO NOT install an inter-tube to correct a leak through the rim.
ST-45HRM CE CONCRETE PUMP— TRAILER SAFETY GUIDELINES Figure 36. Wheel Lug Nuts Tightening Sequence MAYCO ST-45HRM CE PUMP — OPERATION & PARTS MANUAL — REV.
ST-45HRM CE CONCRETE PUMP — TOWING INFORMATION RUNNING GEAR MANUFACTURERS Broadway Industrial Estate, Hyde, Cheshire SK14 4QF Telephone: 0161 368 6414 Fax: 0161 367 8702 Email: enquiries@ meredithandeyre. co.uk RECOMMENDED MAINTENANCE & SERVICE INFORMATION T CHASSIS SUSPENSION AXLES AUTO-REVERSE COUPLINGS GENERAL TRAILER INFORMATION PAGE 38 — MAYCO ST-45HRM CE PUMP — OPERATION & PARTS MANUAL — REV.
ST-45HRM CE CONCRETE PUMP— TOWING INFORMATION 1.0 GENERAL INFORMATION In . order to maintain the function and safety of your trailer, only original parts of the manufacturers design must be used. Servicing should only be undertaken by qualified personnel. 1.1 TOWING LEVEL Ideally, the trailer should be towed level (Figure 37) and not with the draw bar leaning up or down excessively.
ST-45HRM CE CONCRETE PUMP— TOWING INFORMATION 1.4 CONNECTION TO TOWING VEHICLE First, check the compatibility of your 50mm Ball Coupling or Towing Eye with the Towing Jaw/Ball connection on your vehicle. Always fit the breakaway cable or safety chain in a loop, fastening back on itself, to a substantial integral point on the towing vehicle. Ensure that the effective length is as short as possible, but still allows articulation (e.g. for cornering) without applying the brakes or tension through the chains.
ST-45HRM CE CONCRETE PUMP— BRAKING SYSTEM 3.0 BRAKING SYSTEM 3.1 WHEEL JACKING On level ground, with the hand brake lever in the off position and overrun coupling draw tube shaft fully extended forwards, secure one wheel with wheel chocks. Position your jacking device behind the opposite wheel, as near to a main longitudinal chassis member as possible. Lift the wheel clear of the ground and secure with suitable axle stands. NOTE If not already connected, connect the Bowden (sheathed) cables to the brakes.
ST-45HRM CE CONCRETE PUMP — BRAKING SYSTEM 3.4 COUPLING AND TRANSMISSION SYSTEM Attach the opposite end of the outer cable to the anchor plate (Figure 41E) on the axle or draw bar, using the nut provided. Connect the inner cables to the compensator, locking the 2 plain nuts together in front of the compensator for each cable. If not already connected, attach the rear end of the brake rod to the compensator center hole.
ST-45HRM CE CONCRETE PUMP— BRAKING SYSTEM With the handbrake fully off, check that the spring store’s overall length is 185 to 190 mm and is not applying a force to the U shaped guide on the side of the overrun lever. Adjusting is by the nut at the front of the assembly. This procedure should only be necessary when replacement parts have been fitted.
ST-45HRM CE CONCRETE PUMP — BRAKING SYSTEM 3.5 BRAKE PARTS KNOTT COUPLINGS Brake shoes (Figure 42) are recommended to be replaced when the lining thickness measures less than 2mm, as it is likely that they will be worn out before the next service. Always replace both brake shoes together, regardless of the lining thickness on the other shoe. It is further advised that brake shoes should be ideally replaces as an axle set to avoid uneven braking from side to side.
ST-45HRM CE CONCRETE PUMP— BRAKING SYSTEM 4.0 ADJUSTABLE HEIGHT DRAW BARS 4.1 HEIGHT ADJUSTMENT/TIGHTENING JOINTS the principle of the joints is steel pegs engaging with mating dimples (Figures 44A and 44B), which can be seen between the joint plates. While securing the assemblies, the equipment should be “rocked” as the joint pins are tightened to allow positive location. 4.1 GREASING ADJUSTABLE JOINTS There is a grease nipple at each joint pin position 4.
ST-45HRM CE CONCRETE PUMP — BRAKING SYSTEM 5.0 WHEEL HUB ASSEMBLIES 5.1 INSPECTION Ensure the brake shoes (if braked) are clear of the drum with no interference. Clean the hub to remove any road debris. Rotate the hub slowly – there should be no roughness or restriction. Rotate the hub rapidly – There should be no rumble, rattle or high-pitched noises.
ST-45HRM CE CONCRETE PUMP— BRAKING SYSTEM 6.0 OVERRUN COUPLING ASSEMBLY The coupling is greased on assembly, but will require periodic maintenance to ensure a smooth operation of the braking system. Re-grease the shaft bearings via the grease nipples (Figure 46), provided at 9,656 km (6,000 miles) or 6-month intervals. Also ensure correct functioning of all pivots, levers, ratchets and the spring store assembly. Grease all points of movement. Nipples Bellows Figure 46.
ST-45HRM CE CONCRETE PUMP— BRAKING SYSTEM Practically all breakdowns can be prevented by proper handling and maintenance inspections, but in the event of a breakdown, please take a remedial action following the diagnosis based on the Brake System Troubleshooting (Table 10) information shown below. If the problem cannot be remedied, please leave the unit just as it is and consult our company's business office or service plant. TABLE 10.
ST-45HRM CE CONCRETE PUMP— BRAKING SYSTEM TABLE 11. TORQUE FIGURES BY APPLICATION Application Fastern Size 70 / 80mm Drawbar to Axle Nm Lbf.ft 3/8 in. UNF MIN. 40 MAX. 55 MIN. 30 MAX. 40 90 / 100mm Drawbar to Axle M12 90 90 65 65 Towing Eye Cross Bolts M10 55 55 40 40 Towing Eye Cross Bolts M12 75 75 55 55 50mm Ball head Cross Bolts M12 75 75 55 55 M&E Coupling to 80mm Drawbar 1/2 in. UNF 50 60 35 35 M&E Coupling to 90mm Drawbar 1/2 in.
ST-45HRM CE CONCRETE PUMP— MAINTENANCE (PUMP) TABLE 13. ST-45 MAINTENANCE CHECK SCHEDUAL Daily Engine Oil Hourly Weekly X Monthly X Fuel Filter X X Lubrication Box Operational Hours X Engine Air Filter Hydraulic Oil Level 6-Months 500 hrs. X Replace Hydraulic Oil Clean Hydraulic Filters Axle Crank X X Grease Shuttle Tube Zerk Points Grease Remix Bearing 2100 hrs. X 2 hrs X Check System Pressure X 40 hrs. Check Hardware for Tightness X 40 hrs.
ST-45HRM CE CONCRETE PUMP— MAINTENANCE (PUMP) 5. Add water to the hopper. Pump and flush clean the entire hopper, shuttle tube and discharge elbow with water. 6. Scoop out 30.5 cm (12-inches) of concrete from the inboard end of the delivery hose. “Cork Screw” a 15 cm x 15 cm x 20 cm (6" x 6" x 8") sponge into the end of the first hose section. Reconnect the hose to the discharge elbow. 7. Fill hopper with water. Pump until sponge and clean water come out the discharge end of the hose and line system. 8.
ST-45HRM CE CONCRETE PUMP— MAINTENANCE (PUMP) BATTERY MAINTENANCE BRAKE SYSTEM Mishandling of the battery shortens the service life of the battery and adds to maintenance cost. When handling the battery do the following: The brake system should be periodically checked. Look for fluid leaks worn or cracked hoses. Check the reservoir for proper fluid levels. Make sure that all links and pivots are kept lubricated. See Table 13 for troubleshooting tips.
ST-45HRM CE CONCRETE PUMP— MAINTENANCE (PUMP) ST45 PRESSURE SETTING SEQUENCE 6. On the control box, turn the pump control switch (Figure 22) and the test switch (Figure 31) to the “ON” position. Using an allen wrench, adjust the main relief valve (Figure 45) to 24.13 mPa (3,500 PSI). The reading can be taken from the pumping pressure gauge (Figure 52). 7. Hold the main relief valve adjusting bolt with a wrench and tighten the jam nut.
ST-45HRM CE CONCRETE PUMP— MAINTENANCE (PUMP) CYLINDER LUBRICATION BOX ST45 ACCUMULATOR CIRCUIT CAUTION DANGER Before checking lubrication level, stop the engine and remove the ignition key. 1. The lubrication level should be checked everyday prior to pumping and maintained at a height of 12.7 cm (5 inches) or about half the concrete cylinder height.
ST-45HRM CE CONCRETE PUMP— MAINTENANCE (PUMP) SETTING PRESSURE IN THE ACCUMULATOR CIRCUIT 1. Attach a 20.68 mPa (3,000 psi)test gauge (Mayco P/N 98016) to port G2 of the main manifold block (Figure 55). 4. Loosen the lock nut for the the accumulator circuit pilot relief valve cartridge (Figure 57), located at port G4. Using an allen wrench, turn the adjusting screw until pressure gauge reads 13.44 mPa (1,950 psi) and tighten lock nut.
ST-45HRM CE CONCRETE PUMP— MAINTENANCE (PUMP) CHANGING THE CONCRETE CYLINDER PISTON CUPS 6. Remove the three 3/8 – 16 x 3” bolts (Lubrication Pistons Assy, Item 20) from the piston. Remove the front faceplate (Lubrication Pistons Assy, Item 19). 7. Install two the 3/8’ 16x3” bolts (Lubrication Pistons Assy, Item 20) back into the piston – do not tighten. Use the two bolts as leverage to remove the rubber piston cup (Lubrication Pistons Assy, Item 17) and rear components. 8.
ST-45HRM CE CONCRETE PUMP— MAINTENANCE (PUMP) CHANGING THE WEAR PLATE AND RING Wear Plate Installation Due to the swinging motion of the Nun-plate and the abrasive nature of concrete, it is normal for the cutting ring to wear on the side that shears through the concrete inside the hopper. If the wear ring and wear plate do not fully seat against each other the concrete slurry will pump into the hopper.
ST-45HRM CE CONCRETE PUMP— MAINTENANCE (PUMP) EMERGENCY STOP SWITCH FUNCTIONAL TEST EXTENDED STORAGE INSTRUCTIONS There are 2 emergency stop switches on the ST-45 concrete pump. Follow the procedure below to test the switches to make sure that they are both working correctly. The following preventative maintenance is recommended for extended periods of storage. 1. Start the pump as outlined in the start-up procedure. 1. Check brake system for proper fluid level in master cylinder and bleed all lines.
ST-45HRM CE CONCRETE PUMP— HYDRAULIC HOSE CONNECTIONS Figure 58 is provided to show the hydraulic hose connections on the ST-45 for reference when performing inspections and maintenance on the pump. FRONT OF MACHINE M N REMIXER CONTROL MANIFOLD I J L M K L O FRONT OF MACHINE HEAT EXCHANGER LUBRICATION PISTONS N P HYDRAULIC DRIVE PUMP O J I K P FRONT OF MACHINE NOTES HOSES SHADED FOR VISUAL CLARITY. Figure 58.
ST-45HRM CE CONCRETE PUMP— HYDRAULIC HOSE CONNECTIONS Figure 58. Hydrauilc Hose Connections (Continued) PAGE 60 — MAYCO ST-45HRM CE PUMP — OPERATION & PARTS MANUAL — REV.
ST-45HRM CE CONCRETE PUMP— HYDRAULIC HOSE CONNECTIONS Figure 58. Hydrauilc Hose Connections (Continued) MAYCO ST-45HRM CE PUMP — OPERATION & PARTS MANUAL — REV.
ST-45HRM CE — MANIFOLD PORT LOCATIONS Figure 59 is provided to show the locations and names for the two manifold block ports on the ST-45 for reference when peforming maintenance on the pump. Figure 59. Manifold Ports PAGE 62 — MAYCO ST-45HRM CE PUMP — OPERATION & PARTS MANUAL — REV.
NOTE PAGE MAYCO ST-45HRM CE PUMP — OPERATION & PARTS MANUAL — REV.
APPENDIX — ST-45HRM CE CONCRETE PUMPCONCRETE MIX INFORMATION The following information has been extracted from actual testing laboratory reports. The purpose of this printing is only to help create a better understanding of the importance of uniform gradation and proportioning of materials which affect pumpability of concrete mixes. These weights and proportions illustrate that when the sieve analysis is ideal, the sand/rock ratio can be adjusted (65% sand 35% rock) and pumpability should be excellent.
APPENDIX — ST-45HRM CE CONCRETE PUMP CONCRETE MIX INFORMATION A.S.T.M. STANDARD SPECIFICATION FOR GRADING AGGREGATE MAYCO ST-45HRM CE PUMP — OPERATION & PARTS MANUAL — REV.
APPENDIX — ST-45HRM CE CONCRETE PUMP SLUMP TEST 1. To obtain a representative sample (concrete), take several samples at three or more regular intervals throughout the discharge of the mixer or truck. DO NOT take samples at the beginning or end of the discharge. 2. Dampen the inside of the cone and place it on a smooth, moist, nonabsorbent, level surface large enough to accommodate both the slumped concrete and the slump cone.
ST-45HRM CE CONCRETE PUMP — TROUBLESHOOTING (ENGINE) Practically all breakdowns can be prevented by proper handling and maintenance inspections, but in the event of a breakdown, please take a remedial action following the diagnosis based on the Engine Troubleshooting (Table 14) information shown below and on the proceeding page. If the problem cannot be remedied, please leave the unit just as it is and consult our company's business office or service plant. TABLE 14.
ST-45HRM CE CONCRETE PUMP— TROUBLESHOOTING (HYDRAULIC SYSTEM) Practically all breakdowns can be prevented by proper handling and maintenance inspections, but in the event of a breakdown, please take a remedial action following the diagnosis based on the Hydraulic System Troubleshooting (Table 15) information shown below and on the proceeding page. If the problem cannot be remedied, please leave the unit just as it is and consult our company's business office or service plant. TABLE 15.
ST-45HRM CE CONCRETE PUMP— TROUBLESHOOTING (ELECTRICAL SYSTEM) Practically all breakdowns can be prevented by proper handling and maintenance inspections, but in the event of a breakdown, please take a remedial action following the diagnosis based on the Electrical System Troubleshooting (Table 16) information shown below and on the proceeding page. If the problem cannot be remedied, please leave the unit just as it is and consult our company's business office or service plant. TABLE 16.
APPENDIX — ST-45HRM CE SHOTCRETE SYSTEM SHOTCRETE SYSTEM Figure 39. Shotcrete System PAGE 70 — MAYCO ST-45HRM CE PUMP — OPERATION & PARTS MANUAL — REV.
APPENDIX — ST-45HRM CE SHOTCRETE SYSTEM RECOMMENDED SHOTCRETE SYSTEM NO. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 PART NO. EM28904 EM23946 EM28903 EM28005DD EM28061 EM24849 EM28001DD EM23815D EM28902 EM23101 TBD EM24841 EM23808D EM23806 EM23807 PART NAME QTY. COUPLING, 3” H-D “CF” ELBOW, 3"x90° COUPLING, 2.5” H-D w/GASKET & PIN REDUCER, 3”x2.5”x36” H-D ENDS PIPE, 2.5”x120w x 10’ H-D HOSE, 2.5”x2”x36” H-D REDUCER, 2.5”x2”x36” H-D REDUCER, 2.5”x2” w/AIR VIBRATOR COUPLING, 2” H-D w/GASKET & PIN AIR VIBRATOR ASSY.
APPENDIX — ST-45HRM CE CONCRETE PUMP ACCESSORIES RECOMMENDED SHOTCRETE ACCESSORIES Figure 40. Shotcrete System Accessories NOTE Use a 1-3/8" rubber nozzle tip for a wide spray pattern. Use a 1-1/4" rubber nozzle tip for a narrow spray pattern. DO NOT INSTALL THE NOZZLE AT THE END OF THE HOSE UNTIL THE FIRST MATERIAL HAS PASSED THROUGH THE ENTIRE HOSE LENGTH. Disassemble and clean the nozzle assembly thoroughly after each job. Grease all threads before re-assembly.
APPENDIX — ST-45HRM CE CONCRETE PUMP ACCESSORIES RECOMMENDED SHOTCRETE ACCESSORIES NO. 1 2 3 4 5 6 7 8 9 10 11 11 11 12 * 13 * 14 * 15 * 16 * 17 * 18 * 19 * 20 21 PART NO. EM26107 EM23101 EM132 EM23407 EM23408 EM23411 EM912073 EM23409 EM923346 EM406 EM23818 EM24841 EM23845 EM23802 EM23803 EM20816 EM23804 EM23805 EM23806 EM23807 EM911076 EM23808 PART NAME QTY. REMARKS HOPPER SCREEN ....................... 1 .............
ST-45HRM CE PUMP— EXPLANATION OF CODE IN REMARKS COLUMN How to read the marks and remarks used in this parts book. Items Found In the “Remarks” Column Serial Numbers-Where indicated, this indicates a serial number range (inclusive) where a particular part is used. Model Number-Where indicated, this shows that the corresponding part is utilized only with this specific model number or model number variant.
ST-45HRM CE — SUGGESTED SPARE PARTS ST-45HRM CE CONCRETE PUMP 1 Units Qty. P/N 1 .......... EM16462 .............. 4 .......... EM98050 .............. 4 .......... EM16493 .............. 1 .......... EM98033 .............. 2 .......... EM14408 .............. 2 .......... EM16145 .............. 1 .......... EM98021 .............. 2 .......... EM16816-1 ........... 1 .......... EM16816-2 ........... 2 .......... EM98065 .............. 1 .......... EM98022 .............. 2 .......... EM97024 ..............
ST-45HRM CE CONCRETE PUMP— DECAL PLACEMENT DECAL PLACEMENT PAGE 76 — MAYCO ST-45HRM CE PUMP — OPERATION & PARTS MANUAL — REV.
ST-45HRM CE CONCRETE PUMP— DECAL PLACEMENT DECAL PLACEMENT NO. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 PART NO. 511709 EM97082 34536 EM97070 EM97070 EM93000 EM98022 EM995 EM97072 TBD EM985 EM97071 EM97084 EM955 EM97083 TBD EM965 TBD EM1023 DCL305 36999 DCL306 35137 DCL303 M91010000 DCL304 DCL301 NOTE PART NAME QTY.
ST-45HRM CE CONCRETE PUMP— SAFETY GRIDS ASSY. SAFETY GRIDS ASSY. PAGE 78 — MAYCO ST-45HRM CE PUMP — OPERATION & PARTS MANUAL — REV.
ST-45HRM CE CONCRETE PUMP— SAFETY GRIDS ASSY. SAFETY GRIDS ASSY. NO. 1 2 3 4 5 6 7 8 9 10 PART NO. EM98201 EM98202 EM963003 2101402 EM923057 EM98203 EM959179 0161 D EM923343 EM923023 PART NAME GRID, SHUTTLE CYL. 22.5” X 9.0 X 14.5” GRID, BLADE SHAFT 4.5” X 4.5” BOLT 1/4” NC X 3/4” WASHER, LOCK 1/4” MED WASHER, FLAT 1/4” GRID SUPPORT BRACKET NUT, NYLOCK 1/4-20 BOLT, HEX 5/16”-18 X 3/4” WASHER, LOCK 5/16” MED WASHER, FLAT SAE 5/16” QTY.
ST-45HRM CE CONCRETE PUMP— HUB AND DRUM ASSY. HUB AND DRUM ASSY. PAGE 80 — MAYCO ST-45HRM CE PUMP — OPERATION & PARTS MANUAL — REV.
ST-45HRM CE CONCRETE PUMP— HUB AND DRUM ASSY. HUB AND DRUM ASSY. NO. 1 2 3 4 4A 5 5A 6 7 8 9 10 10 10 11 11 11 13 PART NO.
ST-45HRM CE CONCRETE PUMP— BRAKE COMPONENTS ASSY. BRAKE COMPONENTS ASSY. PAGE 82 — MAYCO ST-45HRM CE PUMP — OPERATION & PARTS MANUAL — REV.
ST-45HRM CE CONCRETE PUMP— BRAKE COMPONENTS ASSY. BRAKE COMPONENTS ASSY. NO. 1 2 3 4 6 7 8 9 * 10 11 12 13 * 14 15 PART NO. 33623 44856 45439 35212 45488 42860 43123-1 25455.03 24929.03 42861.03 44445 44444 44443 PART NAME QTY. REMARKS HALF SHELL 1 EYELET 1 READJUSTABLE WEDGE 1 ADJUSTER SHOE POST 1 BOLT 1 SPRING BUCKLE 1 EXPANDER 1 SHOE BRACKET ONLY (NO LINING) 1 SLIDING SHOE .................................................. 1 .............
ST-45HRM CE CONCRETE PUMP— TOWING COUPLER ASSY. TOWING COUPLER ASSY. PAGE 84 — MAYCO ST-45HRM CE PUMP — OPERATION & PARTS MANUAL — REV.
ST-45HRM CE CONCRETE PUMP— TOWING COUPLER ASSY. TOWING COUPLER ASSY. NO. 1 2 3 4 5 6 7 8 9 PART NO. 87003909 98702694 56000594 TBD 69004692 87003909 98857593 69001494 EM300R56501 PART NAME QTY. REMARKS BRAKE LEVER ASSY. 1 ENERGY STORE 1 BREAK-AWAY CABLE 1 BODY ASSY. 1 BELLOWS 1 DAMPER 1 DRAW TUBE W/STOP RING .............................. 1 ............. INCLUDES ITEM W/ * STOP RING 1 COUPLING HEAD 1 MAYCO ST-45HRM CE PUMP — OPERATION & PARTS MANUAL — REV.
HOPPER ASSY. ST-45HRM CE CONCRETE PUMP— HOPPER ASSY. HOPPER ASSY. PAGE 86 — MAYCO ST-45HRM CE PUMP — OPERATION & PARTS MANUAL — REV.
ST-45HRM CE CONCRETE PUMP— HOPPER ASSY. HOPPER ASSY. NO. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 22 23 23 24 25 26 27 28 29 30 31 32 33 34 PART NO. EM25174 EM16184 EM25863 EM23305 EM963610 0166 A EM25301 EM963610 0166 A EM916001 EM18137 EM18138 EM181361 EM621 EM18135 6109180 EM492397 EM916001 EM50141 EM501411 EM25425 EM750 505719 EM963692 6109180 506203 EM708601 EM50417 EM708602 492378 0166 A 492465 512791 EM25483 PART NAME HOPPER ASSY.
TANQUE TRANSMISSION HATZ 57HP ASSY. ST-45HRM CE CONCRETE PUMP— HOPPER ATTACHMENT ASSY. HOPPER ATTACHMENT ASSY. PAGE 88 — MAYCO ST-45HRM CE PUMP — OPERATION & PARTS MANUAL — REV.
ST-45HRM CE CONCRETE PUMP— HOPPER ATTACHMENT ASSY. HOPPER ATTACHMENT ASSY. NO. 1 2 3 4 5 18 19 20 21 22 23 24 25 26 27 PART NO. EM70134-1 EM16159 EM491686 EM70134-2 EM505723 EM16166 EM505728 EM14165 EM619 EM968446 EM505121 EM968446 505123 EM968446 6109160 PART NAME QTY.
ST-45HRM CE CONCRETE PUMP— HOPPER INTERIOR ASSY. HOPPER INTERIOR ASSY. PAGE 90 — MAYCO ST-45HRM CE PUMP — OPERATION & PARTS MANUAL — REV.
ST-45HRM CE CONCRETE PUMP— HOPPER INTERIOR ASSY. HOPPER INTERIOR ASSY. NO. 1 9 10 11 12 13 13A 13B 14 16 17 18 19 20 21 22 23 24 41 42 43 44 45 47 48 49 50 51 52 53 54 55 56 57 PART NO.
ST-45HRM CE CONCRETE PUMP— SHUTTLE CYLINDER ASSY. SHUTTLE CYLINDER ASSY. PAGE 92 — MAYCO ST-45HRM CE PUMP — OPERATION & PARTS MANUAL — REV.
ST-45HRM CE CONCRETE PUMP— SHUTTLE CYLINDER ASSY. SHUTTLE CYLINDER ASSY. NO. 1 2 3 4 5 6 7 8 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 PART NO. EM16145 510684 EM16169 EM25236 EM505490 EM16814 EM458 EM417 EM254549 492397 492600 6109180 492584 EM505490 EM25500 EM509372 EM25459 EM509373 EM25434 EM254542 EM717 EM254541 EM26126 PART NAME QTY.
REAR HOOD ASSY ST-45HRM CE CONCRETE PUMP— FUEL AND HYDRAULIC TANK ASSY. FUEL AND HYDRAULIC TANK CONNECTIONS ASSY PAGE 94 — MAYCO ST-45HRM CE PUMP — OPERATION & PARTS MANUAL — REV.
ST-45HRM CE CONCRETE PUMP— FUEL AND HYDRAULIC TANK ASSY. FUEL AND HYDRAULIC TANK CONNECTIONS ASSY NO. 5 6 7 8 9 10 11 12 13 24 25 26 27 28 29 31 32 33 34 35 36 43 44 45 46 47 49 50 51 52 53 54 55 57 58 60 61 62 PART NO.
REAR HOOD ASSY. ST-45HRM CE CONCRETE PUMP— FUEL AND HYDRAULIC TANK ASSY. FUEL AND HYDRAULIC TANK ASSY. (CONTINUED) PAGE 96 — MAYCO ST-45HRM CE PUMP — OPERATION & PARTS MANUAL — REV.
ST-45HRM CE CONCRETE PUMP— FUEL AND HYDRAULIC TANK ASSY. FUEL AND HYDRAULIC TANK ASSY. (CONTINUED) NO. PART NO. PART NAME 1 509772 RESERVOIR, FUEL AND HYDRAULIC OIL 2 509786 ELBOW, SUCTION 3 510591 ELBOW 4 491164 SUCTION NIPPLE 3/4” 14 EM18447 PLUG 3/4” PIPE SQ H 15 509369 ADAPTER 1/2- FF- S 16 491237 GATE VALVE 1/2” NPT FEMALE VALVE 17 506094 PLUG 1/2” NPT GALVANIZED 18 16512 RETURN FILTER ASSY.
FRONT COVER ASSY.ST-45HRM CE CONCRETE PUMP— FRONT COVER ASSY. FRONT COVER ASSY. PAGE 98 — MAYCO ST-45HRM CE PUMP — OPERATION & PARTS MANUAL — REV.
ST-45HRM CE CONCRETE PUMP— FRONT COVER ASSY. FRONT COVER ASSY. NO. 7 8 9 10 14 17 18 19 PART NO. EM963003 EM923057 2101402 EM510271 29057 EM969079 EM97063 510687 PART NAME QTY. REMARKS BOLT 1/4” NC X 3/4” 19 WASHER, FLAT 1/4” 23 WASHER, LOCK 1/4” DIAMETER 15 COVER, FRONT ................................................ 1 ............. SAFETY ITEM DOCUMENT BOX 1 NUT LOCK NYLOC 1/4” 4 EMERGENCY STOP SWITCH .......................... 1 ............. SAFETY ITEM COVER, TOP ....................................
ST-45HRM CE CONCRETE PUMP— HEAT EXCHANGER ASSY. HEAT EXCHANGER ASSY. PAGE 100 — MAYCO ST-45HRM CE PUMP — OPERATION & PARTS MANUAL — REV.
ST-45HRM CE CONCRETE PUMP— HEAT EXCHANGER ASSY. HEAT EXCHANGER ASSY. NO. PART NO. PART NAME QTY. REMARKS 1 EM509802 GUARD, HEAT EXCHANGER 1 2 EM963610 BOLT 3/8” 4 3 3019892 WASHER, FLAT 3/8” 6 4 EM969013 NUT, LOCK 3/8” 4 5 EM25171 GASKET, RUBBER 1 6 EM98049 HEAT EXCHANGER 1 7 492364 SCREW HHC 5/16” X 18 X 1” 4 8 EM923023 WASHER, FLAT 5/16” 4 9 2105164 NUT, NYLON 5/16”- 18 4 10 EM509805 COVER ............................................................... 1 .............
ST-45HRM CE CONCRETE PUMP— ENGINE AND FRAME ASSY. ENGINE AND FRAME ASSY PAGE 102 — MAYCO ST-45HRM CE PUMP — OPERATION & PARTS MANUAL — REV.
ST-45HRM CE CONCRETE PUMP— ENGINE AND FRAME ASSY. ENGINE AND FRAME ASSY NO. 1 2 3 4 6 7 8 9 10 11 29 30 31 32 35 36 37 PART NO. 020310080 030210250 EM23118 EM01005 509405 503117 3019092 EM969013 508776 EM25610 EM70186 EM745 EM744 EM20732 EM942 491744 EM60701 PART NAME NUT WASHER, LOCK SHOCK MOUNT CONNECTOR LINK, CHAIN FRAME, MAIN BOLT, HEX 3/8” WASHER 3/8” NUT, NYLOC RUBBER PAD JACK STAND, FRONT JACK STAND, REAR PIN CLEVIS PIN 1/2” X 4” CONNECTOR TAG, IDENTIFICATION RIVET HATZ DIESEL ENGINE 57HP QTY.
ST-45HRM CE CONCRETE PUMP— THROTTLE AND WATER FILTER ASSY. THROTTLE AND WATER FILTER ASSY. PAGE 104 — MAYCO ST-45HRM CE PUMP — OPERATION & PARTS MANUAL — REV.
ST-45HRM CE CONCRETE PUMP— THROTTLE AND WATER FILTER ASSY. THROTTLE AND WATER FILTER ASSY. NO. 29 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 61 PART NO.
ST-45HRM CE CONCRETE PUMP— HYDRAULIC PUMP ASSY. HYDRAULIC PUMP ASSY. PAGE 106 — MAYCO ST-45HRM CE PUMP — OPERATION & PARTS MANUAL — REV.
ST-45HRM CE CONCRETE PUMP— HYDRAULIC PUMP ASSY. HYDRAULIC PUMP ASSY. NO. 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 20 22 23 24 25 26 28 60 61 63 64 65 PART NO. EM16306 EM146 EM16303 EM16302 EM16741 EM162 EM98025 EM510902 EM635 492600 EM25507 EM25429 EM509366 EM505533 EM97001 EM509341 EM25497 EM25429 EM97002 EM963610 0166 A EM25498 EM16524 506195 509637 509370 510984 509374 509371 PART NAME COUPLING, ENGINE BOLT 12 MM X 1” ALLEN HEAD COUPLING, CHAIN COUPLING, PUMP COVER, ENGINE BOLT 10 X 25MM SOC.
ST-45HRM CE CONCRETE PUMP— LUBRICATION PISTONS ASSY. LUBRICATION PISTONS ASSY. PAGE 108 — MAYCO ST-45HRM CE PUMP — OPERATION & PARTS MANUAL — REV.
ST-45HRM CE CONCRETE PUMP— LUBRICATION PISTONS ASSY. LUBRICATION PISTONS ASSY. NO. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 27 28 29 30 31 32 33 34 35 36 37 38 39 40 42 43 44 45 PART NO.
SISTEMA ELECTRICO HATZ ASSY. ST-45HRM CE CONCRETE PUMP— ELECTRICAL SYSTEM ASSY. ELECTRICAL SYSTEM ASSY. PAGE 110 — MAYCO ST-45HRM CE PUMP — OPERATION & PARTS MANUAL — REV.
ST-45HRM CE CONCRETE PUMP— ELECTRICAL SYSTEM ASSY. ELECTRICAL SYSTEM ASSY. NO. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 28 29 30 PART NO. 512759 491028 491030 EM256073 512760 512761 505303 508437 512762 512763 EM98066 508632 508259 512764 504984 512800 512801 512802 512803 508259 512804 491894 512805 512806 512807 EM97025 508632 508238 505501 PART NAME QTY.
ST-45HRM CE CONCRETE PUMP— ACCUMULATOR ASSY. ACCUMULATOR ASSY. PAGE 112 — MAYCO ST-45HRM CE PUMP — OPERATION & PARTS MANUAL — REV.
ST-45HRM CE CONCRETE PUMP— ACCUMULATOR ASSY. ACCUMULATOR ASSY. NO. 34 35 36 37 38 39 40 42 43 PART NO. EM97015 EM97016 EM9603055 3019092 0166A EM509425 EM509353 EM98009 509372 PART NAME ACCUMULATOR 1 GALLON BRACKET, ACCUMULATOR HHCS 3/8” DIAMETER WASHER, FLAT 3/8” WASHER, LOCK 3/8” DIAMETER FITTING ELBOW ACCUMULATOR REPAIR KIT HOSE, ACCUMULATOR QTY. 1 1 2 2 2 1 1 1 1 REMARKS MAYCO ST-45HRM CE PUMP — OPERATION & PARTS MANUAL — REV.
ST-45HRM CE CONCRETE PUMP— MANIFOLD ASSY. MANIFOLD ASSY. PAGE 114 — MAYCO ST-45HRM CE PUMP — OPERATION & PARTS MANUAL — REV.
ST-45HRM CE CONCRETE PUMP— MANIFOLD ASSY. MANIFOLD ASSY. NO. 1 2 3 4 5 6 7 8 9 10 11 12 13 15 20 21 22 23 24 25 26 27 28 PART NO. EM97000 EM963610 3019092 0166 A EM25462 EM98018 EM25429 EM98015 EM25429 EM98006 EM25498 EM509352 EM509353 EM25462 EM509398 EM97010 EM50932 EM196 EM508804 EM97011 EM97002 EM97013 EM97008 PART NAME MANIFOLD ASSY.
ST-45HRM CE CONCRETE PUMP— REMIXER CONTROL ASSY. REMIXER CONTROL ASSY. PAGE 116 — MAYCO ST-45HRM CE PUMP — OPERATION & PARTS MANUAL — REV.
ST-45HRM CE CONCRETE PUMP— REMIXER CONTROL ASSY. REMIXER CONTROL ASSY. NO. 22 23 24 25 26 27 28 30 32 33 PART NO. EM97017 EM218 EM923343 492553 EM25507 EM512655 506195 EM25563 EM98012 EM98015 PART NAME VALVE REMIX W/LEVER BOLT 5/16”- 18 X 2, 1/2HXHDCS WASHER, LOCK 5/16” DIAMETER NUT, HEX 5/16” DIAMETER- NC FITTING, 90° ADAPTER FITTING, 90° TEE, CUSTOM ADAPTER GAUGE COUPLING, TEST PORT QTY. 1 2 2 2 1 2 2 1 1 1 REMARKS MAYCO ST-45HRM CE PUMP — OPERATION & PARTS MANUAL — REV.
ST-45HRM CE CONCRETE PUMP— BATTERY ASSY. BATTERY ASSY PAGE 118 — MAYCO ST-45HRM CE PUMP — OPERATION & PARTS MANUAL — REV.
ST-45HRM CE CONCRETE PUMP— BATTERY ASSY. BATTERY ASSY NO. 1 2 3 4 5 PART NO. 34506 6109100 EM16738 EM16707 EM509105 PART NAME BATTERY BOX BATTERY HOLD-DOWN STRAP BATTERY CABLE, BATTERY NEGATIVE CABLE, BATTERY POSITIVE QTY. 1 1 1 1 1 REMARKS MAYCO ST-45HRM CE PUMP — OPERATION & PARTS MANUAL — REV.
ST-45HRM CE CONCRETE PUMP— LUBRICATION PANEL GREASE POINTS NOTE Grease daily, two or three hots of #2 multipurpose automotive grease. Over greasing any bearing will not damage the machine. ALWAYS grease before and after pump operation. POSITION LOCATION LENGTH OF LINES A ................................................. PIVOT BRACKET GREASE POINT ................................. 41 in. (1.04 m) B ................................................. AXLE CRANK GREASE POINT ..................................
ST-45HRM CE CONCRETE PUMP— LUBRICATION PANEL GREASE POINTS NO. 1 2 3 4 5 6 PART NO. EM491701 EM208812 EM510684 EM510486 EM510487 TBD PART NAME GREASE FITTING CONNECTOIR CONNECTOR HOSE, PLASTIC HOSE, PLASTIC HOSE, STEEL QTY. 3 2 3 1 1 1 REMARKS MAYCO ST-45HRM CE PUMP — OPERATION & PARTS MANUAL — REV.
ST-45HRM CE CONCRETE PUMP— CONTRL. BOX INTERIOR DOOR ASSY. CONTROL BOX INTERIOR DOOR ASSY. PAGE 122 — MAYCO ST-45HRM CE PUMP — OPERATION & PARTS MANUAL — REV.
ST-45HRM CE CONCRETE PUMP— CONTRL. BOX INTERIOR DOOR ASSY. CONTROL BOX INTERIOR DOOR ASSY. NO. 1 2 3 4 5 6 7 8 9 10 12 13 PART NO. EM97050 EM97048 EM97027 EM97078 EM98001 EM98002 EM40711 TBD TBD EM97068 EM97049 52016 PART NAME RELAY , SMALL RELAY, LARGE SOLENOID, 12 VOLT FUSE, 15 AMP DIODE, 6 AMP DIODE SWITCH, EMERGENCY CYCLE NUT CONNECTOR REMOTE CONTROL RECEPTACLE BASE, SOCKET RELAY QTY. 2 1 3 6 1 19 1 4 4 1 1 1 REMARKS MAYCO ST-45HRM CE PUMP — OPERATION & PARTS MANUAL — REV.
ST-45HRM CE CONCRETE PUMP— CONTROL BOX MOUNTING ASSY. CONTROL BOX MOUNTING ASSY. PAGE 124 — MAYCO ST-45HRM CE PUMP — OPERATION & PARTS MANUAL — REV.
ST-45HRM CE CONCRETE PUMP— CONTROL BOX MOUNTING ASSY. CONTROL BOX MOUNTING ASSY. NO. 35 36 37 38 39 40 PART NO. 492366 EM510703 2105164 EM503112 3019092 EM969013 PART NAME QTY. REMARKS SCREW HHC 5/16-18x1-1/2 4 SHOCK MOUNT 4 NUT 3/8 IN. ....................................................... 4 ...............REPLACES 492582 BOLT HHC 3/8-16x2-3/4 2 FLAT WASHER .................................................. 4 ...............REPLACES 492598 NUT ............................................................
ST-45HRM CE CONCRETE PUMP— CONTROL BOX ASSY. CONTROL BOX ASSY. PAGE 126 — MAYCO ST-45HRM CE PUMP — OPERATION & PARTS MANUAL — REV.
ST-45HRM CE CONCRETE PUMP— CONTROL BOX ASSY. CONTROL BOX ASSY. NO. 1 2 3 4 5 6 7 8 9 10 11 12 13 PART NO. EM25704 EM97063 EM97039 EM97041 EM97062 EM97028K EM97028 EM97030 EM97036 EM97045 EM97032 EM97073 EM98039 PART NAME QTY.
ST-45HRM CE CONCRETE PUMP— CONTROL BOX DOOR WIRING PAGE 128 — MAYCO ST-45HRM CE PUMP — OPERATION & PARTS MANUAL — REV.
ST-45HRM CE CONCRETE PUMP— CONTROL BOX INTERIOR WIRING MAYCO ST-45HRM CE PUMP — OPERATION & PARTS MANUAL — REV.
ST-45HRM CE CONCRETE PUMP— TERMINAL BLOCK WIRING DIAGRAM PAGE 130 — MAYCO ST-45HRM CE PUMP — OPERATION & PARTS MANUAL — REV.
NOTE PAGE MAYCO ST-45HRM CE PUMP — OPERATION & PARTS MANUAL — REV.
ST-45HRM CE CONCRETE PUMP— CONTROL BOX ELECT. DIAGRAM PAGE 132 — MAYCO ST-45HRM CE PUMP — OPERATION & PARTS MANUAL — REV.
ST-45HRM CE CONCRETE PUMP— CONTROL BOX ELECT.
ST-45HRM CE CONCRETE PUMP— CONTROL BOX ELECT.
ST-45HRM CE— HYDRAULIC DIAGRAM Par t ID Description 1 MAIN PUMP 3000 PSI Quantity 1 2 SECONDARY PUMP, ACCUMULATOR & REMIXER 1 3 FLOW CONTROL BLOCK ASSEMBLY 1 3A FLOW CONTROL 1 3B RELIEF VALVE, FLOW CONTROL 1 4 MAIN MANIFOLD ASSEMBLY 1 4A MAIN VALVE 1 4B SHUTTLE VALVE 1 4C PILOT VALVE 1 4D ACCUMULATOR CIRCUIT DUMP VALVE 1 4E UNLOADING VALVE 1 4F CHECK VALVE 1 4G RELIEF, ACCUMULATOR CIRCUIT 1 4H TEST VALVE 1 5 ACCUMULATOR 1 6 PROXIMITY SWITCH 2 6A CONDUCTOR
ST-45HRM CE— OPTIONAL RADIO CONTROL PAGE 136 — MAYCO ST-45HRM CE PUMP — OPERATION & PARTS MANUAL — REV.
ST-45HRM CE— TAIL LIGHTS WIRING DIAGRAM MAYCO ST-45HRM CE PUMP — OPERATION & PARTS MANUAL — REV.
TERMS AND CONDITIONS OF SALE — PARTS Effective: October 1, 2002 PAYMENT TERMS 5. Parts must be in new and resalable condition, in the original Multiquip package (if any), and with Multiquip part numbers clearly marked. 6. The following items are not returnable: Terms of payment for parts are net 10 days. FREIGHT POLICY All parts orders will be shipped collect or prepaid with the charges added to the invoice. All shipments are F.O.B. point of origin.
MAYCO PUMP WARRANTY Mechanical Drive Models Hydraulic Drive Models MAYCO PUMP, hereinafter referred to as “Manufacturer’, warrants each new Mayco Pump sold by the manufacturer to be free from defects in material and workmanship, under normal use and service, for a period of one year after the date of delivery to the original retail purchaser.
OPERATION AND PARTS MANUAL HERE'S HOW TO GET HELP PLEASE HAVE THE MODEL AND SERIAL NUMBER ON-HAND WHEN CALLING PARTS/SERVICE/ WARRANTY LANCASHIRE, OL7 OLT UNITED KINGDOM (UK) CALL: PHONE: 161-339-2223 FAX: 161-339-3226 MULTIQUIP (UK) HANOVER MILL FITZROY STREET ASHTON-UNDER-LYNE LANCASHIRE, OL7 OTL UNITED KINGDOM PH. 0161-339-2223 FAX.