user manual
ASSEMBLY INSTRUCTIONS/OPERATIONS
8FP FLOOR PLANER SERIES  OPERATION AND PARTS MANUAL REV #2 (05/28/09)  PAGE 38 
FIGURE 46 
7) Clean and inspect the internal hexagon bushing for 
damage  and excessive wear. Replace the bushing if 
required. 
8) Position the bearing block on the arbor press with 
the bearing facing down. Determine that the bearing 
block is properly supported. Using the arbor press and 
an  appropriate sized thrust bushing, remove the 
bearing from the block. FIGURE 47. 
9) Clean the inside bore diameter of the bearing block 
and inspect for damage. 
10) Clean the outside diameter of the replacement 
bearing. Apply a suitable  amount of anaerobic 
adhesive/sealant to the outside diameter of the 
bearing. Align and press the replacement bearing into 
the bea
ring housing until it seats itself against the 
flange. FIGURE 48. 
FIGURE 47 
FIGURE 48 
11) Position the bearing block with the bearing facing 
down. Determine that the bearing block and 
replacement bearing  are both properly supported. 
Using the arbor press, align and press the internal 
hexagon bushing into the bearing block until it seats 
itself against the flange. FIGURE 49. 
12) Reinstall the snap ring on the internal hexagon 
bushing. 
CAUTION
Wear safety glasses and other appropriate apparel 
when removing/installing the snap ring or 
performing any work with an arbor press. Caution 
all onlookers about the possibility of flying debris 
and personal injury. 










