PAGE 36 — DCA-150USJ — OPERATION AND PARTS MANUAL — REV. #1 (01/15/08)
DCA-150USJ — GENERATOR START-UP PROCEDURE (MANUAL)
The engine's exhaust contains harmful emissions.
ALWAYS have adequate ventilation when operating
.
Direct exhaust away from nearby personnel.
Before Starting 4. Close all engine enclosure doors (Figure 40).
Figure 40. Engine Enclosure Doors
1. Place the
main, G.F.C.I.,
and
aux.
circuit breakers
(Figure 39) in the OFF position prior to starting the engine.
2. Connect the load to the
receptacles
or
the
Output
Terminal Lugs
as shown in Figure 13. These load
connection points can be found on the output terminal
panel and the output terminal panel’s hard wire hookup
panel.
3. The output terminal lugs are protected by a plastic cover.
Remove this cover to gain access to the terminals.
Tighten terminal nuts securely to prevent load wires from
slipping out.
Figure 39. Main, Aux. and GFCI
Circuit Breakers (OFF)
NEVER!
manually start the engine with the
main
,
GFCI
or
auxiliary
circuit breakers in the ON (closed) position.
5. Place the
voltage selector switch
in the desired voltage position
(Figure 41).
Figure 41. Voltage
Selector Switch
CAUTION - LETHAL EXHAUST HAZARD
WARNING - STARTING THE GENERATOR