Operations Manual

06 Oct 2022
This document contains proprietary and confidential information originated or owned by Cubic. Neither this document nor the
information disclosed herein shall be reproduced or transferred to other documents or used or disclosed to others for
manufacturing or any other purposes except as specifically authorized in writing by Cubic.
8800-45001.A
4-2
4.2 PREVENTIVE MAINTENANCE SCHEDULE
Table 4-2 provides a schedule with suggested intervals for preventive maintenance. The actual frequency
may be further developed and adjusted based on actual equipment operating conditions and environments.
Table 4-2. Schedule
Action Frequency
Visually inspect the exterior of the Validator As needed
Clean the exterior of the Validator
As needed
Verify that there is no visible damage to the Validator housing Every 3 months
Verify that there is no visible damage to the Validator mount Every 3 months
Verify that there is no visible damage to the Validator screen
Every 3 months
Verify that the Validator mount is tight and secure Every 3 months
Verify that the Validator ID Label is present and readable Every 3 months
Remove foreign substances from the Validator housing Every 3 months
Verify that there is no visible damage to the Antenna housing Every 3 months
Verify that the antenna mount is tight and secure Every 3 months
Remove foreign substances from the antenna housing
Every 3 months
Verify function of the Validator by tapping an AFC 2.0 card to the
reader
Every 3 months
LED test Every 6 months
Speaker test
Every 6 months
Card reader test Every 6 months
Verify that all connections at PDBs are secure Every 6 months
Verify that PDBs are mounted securely
Every 6 months
Change lithium coin cell battery Every 6 years