Owner`s manual

!
5!
Tube and tube shield installation
Tube compliment:
2 6DJ8’s - V1 and V2
2 12AX7 - V3 and V4
2 12AT7 - V5 and V6
1 6X4 - high voltage rectifier
Install the tubes:!!When inserting tubes into their sockets, be
very careful not to bend the metal pins. Begin by installing the tall
6X4 rectifier tube into the socket just in front of the power transformer
housing. Continue installing the other six tubes by first inserting two
6DJ8’s in the two sockets nearest the rear of the chassis, V1 and V2.
Next, insert two 12AX7’s in the middle two sockets, V3 and V4. And
finally, install two 12AT7’s in the remaining sockets nearest the front
panel, V5 and V6.
Install the tube shields: The three silver tube shields
provided are vitally important in keeping noise away from the three
most rear tubes, V1, V2 and V3. There is a gap around those three
tube sockets, and down in each of those gaps are two metal pins that
the tube shields lock on to. Note the locking-slots at the bottom of the
tube shields. The unit should be powered off with AC cable
disconnected.
1
MM
MC
LEFT
MM
MC
RIGHT
POWER TRANSFORMER
6X4
FRONT OF UNIT
6922
6922
12AX7
12AX7
12AT7
12AT7
2
3
4
5
6