Installation Guide
8 www.mylenstairs.com
Platform and Base Installation
1. While all treads (8) and platform (9) are on the ground, partially thread set
screws (A) into each tread and platform sleeve.
2. Partially thread set screws (A) into the baseplate (1). Insert the center
column assembly into the baseplate until is fully seated. Attach the
baseplate (1) to the center column assembly with set screws (A).
3. Stand center column assembly up inside the well opening.
4. Slide the treads over the center column assembly.
5. Slide the platform over the center column assembly. Position the platform
to where the top surface of the platform is flush with the mounting floor
surface.
NOTE: Depending on how the platform is being mounted in your application,
3/8” holes may need to be drilled through the platform edge as needed to
install the mounting lag screws. If the platform is being mounted in a corner,
make sure that both edges of the platform are secured to the wall.
The platform is heavy. Steps 4 through 6 require a minimum of
3 people. One to keep the column steady and 2 people
hoist and hold the platform in place. A fourth person may
then drill and fasten the platform.
6. Use 3/8”x3” lag screws (C) and washers (B) to attach the platform to the
mounting surface.
Hardware
Ⓐ Ⓑ Ⓒ
Parts
⑧ ⑨ ⑩
Tools