Installation Guide

13 www.mylenstairs.com
Bottom Baluster Installation
NOTE: The main baluster connecting the bottom tread to the floor must be cut.
1. Cut approximately 1 ½” off the bottom of the last main baluster.
2. Place the bottom baluster bracket on the ground below the first tread.
Guide the baluster through the hole in the first tread and into the hole of
the bottom baluster bracket.
3. Adjust the height of the lower tread to be one riser height below the tread
above. Fasten the baluster with carriage bolt (G), nut (F), washer (D) and
lock washer (E).
4. Check that the tread is level and the baluster is plumb. Tighten the 5/16”
set screws in the tread hub to lock the tread to the center column.
5. Ensure that the baluster remained plumb, then fasten the bottom baluster
bracket to the floor using wood screws (U). Masonry fasteners (not
supplied) will need to be used if installing into concrete.
Hardware
ⒹⒺⒻⒼ
Parts
Tools