Specifications

Name
Address
Contact
Number
Signature Date
Name
Address
Contact
Number
Signature Date
Name
Address
Contact
Number
Signature Date
19
17
Installer Details
Commissioning Engineer Details
18
JG Speedfit Representative (if Present)
16
Once all checks have been completed and the system is working correctly, the
commissioning engineer should ensure that the user has been made aware of how the
system operates and how to, set the room thermostats and time controls. The user should
be left with a copy of the installation drawing, installation instructions together with the
commissioning and user documentation for their records.
YES NO
15
With the system running, check with the aid of an info red thermometer that the average
floor surface temperatures to not exceed 29°C, except in areas round the manifold or in
areas noted on the design drawings which show the use of perimeter zones where pipes
have smaller centres. These areas should not generally be greater that 35°C (BSEN1624).
The average floor surface design temperatures can also be checked. Remember, results
will depend on whether the specified floor covering is installed.
YES NO
The design flow surface temperatures for each
zone are shown on the Manifold Installation
sheet supplied with the full design package.
(An indication of the presence on perimeter
zone spacing is also shown and denotes areas
of higher floor temperatures). Remember, the
floor finish will have an effect of floor
temperatures.
Page 3 of 3