Use and Care Manual

700
700
MUSUP-V2
Mounting board
Mounting height
Mounting
Bracket
Page 6
4. INSTALLATION
NOTE
APPLICABLE TO ALL POWER UNITS:
The power unit must be installed in a well-ventilated area, away from weathering. It must be easily accessible and away from any heat source.
The power unit must be installed near an adequate electrical outlet. You must have at least 6’’ of clearance space all around the unit
1.Measure the bottom clearance space to be able to remove your bag and your canister easily
For 25L canister (NAD-700ST-25H AND NAD-630ST-25H:
Minimum of 14’’ clearance space
For 35L canister (NAD-750ST-35H):
Minimum clearance space of 16’’
2.Measure where your bracket must be installed
Take the measurement from the bottom of the
Vacuum to where the hook will be inserted in the vacuum.
Installation on a gypsum wall (Gyprock):
-Prepare the wall by installing a plywood mounting board (not provided) of
Wide enough to be screwed to at least 2 studs.
-Drill three (3), 3/8’’ (10 mm) holes with a wood drill bit. Insert the supplied
Rubber inserts. Fasten the steel mounting bracket with the supplied screws.
Installation on a concrete wall:
- Drill three (3), 3/8’’ (10 mm) holes with a concrete drill bit.
- Insert the supplied rubber i
nserts.
- Fasten the steel mounting bracket with the supplied screws.
3. Hang your unit on the bracket
NOTE: We suggest to install a wood board to solidify the bracket
CLEARANCE
SPACE
CLEARANCE
SPACE
14’’
25L Canister
35L Canister
FLOOR
16’’
FLOOR
700
CLEARANCE SPACE
+
HOOK
MEASUREMENT
HEIGHT WHERE
THE HOOK MUST BE
FLOOR
25L = 14’’
35L = 16’’
25L = 35’’
35L = 40’’
25L = 21’’
35L = 24’’
25L = 21’’
35L = 24’’
Hook
Add this measurement to the
Bottom clearance measurement.
Insert the hook in the middle of the bracket on the vacuum.
Since1980
700
750
700