User's Manual

31. Repeat steps 27-30 to fit the other Swing Arm Assembly.
32. Replace the Rosta Spring Shaft Assembly to the Main Base Assembly and fit, finger tight,
the 7off Hex Head Screws (M6x25). Fully tighten the screws.
Note: This item is heavy. Ensure that two people are available to replace this item.
33. Replace the Ride Assembly on to the
bearings and Joint Box making sure
that the wires and air tube are passed
through and taking care not to trap
fingers or clothing.
Note: This item is heavy. Ensure that
two people are available to replace
this item.
34 Fit, finger tight, the 8off Hex Head
Screws (M10x25) to retain the Ride Assy to the Bearings.
35. Push the Ride Base forward to align the holes in the Joint Box with the threaded holes in
the Ride Base and fit the 4off Hex Head Screws (M10x25).
Tighten fully all 12 Hex Head Screws (M10x25).
36. Replace the Stand-On Metal Plate on
to the Ride Base making sure that the
wires and air tube are passed through.
37. Fit, finger tight, the 2off Hex Head
Screws (
3
/8 x
3
/4 AF) to the top of the air
spring.
38. Fit, finger tight, the 8off Hex Head
Screws (M8x25) retaining the Stand-
On Metal Plate to the Ride Assembly.
Tighten fully the M8x25 and
3
/8 x
3
/4 AF
screws.
39. Replace the Wooden Plate ensuring
that the wires and air tube pass into
the tank speaker box and are not
trapped.
40. Replace the Vac-Form Support
Brackets and retain finger tight using
4off Pozi Head Screws (M5x25).
Note: The Vac-Form support Brackets
are handed. Ensure that they are
fitted the correct way.
41. Fit, finger tight 6off Pozi Head Screws
(M5x25) retaining the Wooden Plate
to the Stand-On Metal Plate. Tighten
fully all ten (M5x25) screws.
42. Reconnect the 15way connector and refit the Earth wire, using the Pozi Head Screw
(M4x12), in the Tank Speaker Box. Ensure that the Earth Wire connection is tight.