Installation Guide

21
W415-0762 / B / 11.12.10
With appliance and chimney installation completed, move the bricks into place for your appliance as
previously illustrated.
A. Install the bottom bricks, working from the back of the appliance forward.
B. Install ve (1100PL) or six (1400PL) bricks along both sides of the appliance. Before installing the back
bricks, loosen the screw holding the retainer and ensure that it has been moved forward. Install the
six bricks along the back wall by pivoting the bricks up under the brick retainer. Retighten the screw.
NOTE: Center bricks have been cut.
C. Carefully pivot bre baf e up onto the top of the side brick. Slide it over onto the ange of the manifold.
Ensure that the top baf es are pushed all the way to the rear of the rebox, leaving a minimum of a 1”
gap along the front. This will allow the ue gases to escape the rebox.
D. Install the 4 bricks along the front.
NOTE: Do not operate if baf e and manifold shield are not in position.
5.6 BRICKS AND BAFFLES INSTALLATION
OPERATION OF THE APPLIANCE WITHOUT THE BAFFLES CAN RESULT IN EXCESSIVE TEMPERA-
TURES THAT COULD DAMAGE THE APPLIANCE, CHIMNEY AND THE SURROUNDING ENCLOSURE.
!
WARNING
1
1
1
1
1
1
1
1
1
1
1
5
1
1
1
2
1
11
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
2
2
2
2
2
2
3
4
8
9
11
2
3
4
4
4
6
5
6
8
9
10
10
11
1100PL / 1100C 1400PL / 1400C
1 1 1/4” x 4 1/2” x 9” 6 1 1/4” x 1 1/2” x 4 1/2” 11
9” x 2” x 16 1/2”
(Fibre Baf es)
2 1 1/4” x 3” x 9” 7
1 1/4” x 4 1/2” x 9”
(Light Weight)
12
9” x 1” x 9 3/4”
(Front Fibre Baf es)
3 1 1/4” x 4 1/2” x 4 1/2” 8 1 1/4” x 2 1/4” x 9” 13
9” x 1” x 9 3/4”
(Back Fibre Baf es)
4
1 1/4” x 4 1/2” x 9”
(Notched)
9 1 1/4” x 2 1/2” x 6 1/8”
5 1 1/4” x 2 1/2” x 4 1/2” 10
9” x 1” x 12”
(Fibre Baf es)