Installation Manual
Table Of Contents
- W415-1285_Fe
- 1.0 installation overview
- 2.0 introduction
- 3.0 venting
- 4.0 installation
- 5.0 framing
- 6.0 Finishing
- 6.1 main SAFETY SCREEN removal / installation
- 6.2 end SAFETY SCREEN removal / installation (bhd4p only)
- 6.3 MAIN door removal / installation
- 6.4 END DOOR REMOVAL / installation (bhd4p only)
- 6.5 control panel removal
- 6.6 hearth pad installation
- 6.7 log placement
- 6.8 glass media installation
- 6.9 logo placement
- 7.0 wiring diagram
- 8.0 operating instructions
- 9.0 Adjustment
- 10.0 MAINTENANCE
- 11.0 replacements
- 12.0 accessories
- 13.0 troubleshooting
- 14.0 warranty
- 15.0 SERVICE HISTORY
- W415-1285_Ff
- 1.0 vue d'ensemble de l'installation
- 2.0 introduction
- 3.0 éVACUATION
- 3.1 LONGUEURS DES CONDUITS D’ÉVACUATION ET COMPOSANTS
- 3.2 INSTALLATIONS TYPIQUES D'ÉVENTS
- 3.3 INSTALLATIONS PARTICULIÈRES D'ÉVENTS
- 3.4 convertir l'Évacuation de 5/8" À 4/7"
- 3.5 EMPLACEMENTS ET DÉGAGEMENTS MINIMAUX DE LA TERMINAISON
- 3.6 CHARTE D'APPLICATION DES ÉVACUATIONS
- 3.7 LÉGENDE
- 3.8 VALEURS DU COUDE EN LONGUEURS D'ÉVENT
- 3.9 TERMINAISON HORIZONTALE
- 3.10 TERMINAISON VERTICALE
- 4.0 installation
- 5.0 ossature
- 6.0 Finitions
- 6.1 RETRAIT de l'écran de protection PRINCIPAL et l'installation
- 6.2 RETRAIT de l'écran de protection fin et l'installation (SEULEMENT bhd4p)
- 6.3 installation / enlèvement de la porte PRINCIPALE
- 6.4 Enlèvement DE LA PORTE D'EXTRÉMITÉ / INSTALLATION (SEULEMENT bhd4p)
- 6.5 enlèvement de PANNEAU DE CONTRÔLE
- 6.6 INSTALLATION des bases de protection (bHD4ST Et bHD4P SEULEMENT)
- 6.7 DISPOSITION DES BÛCHES
- 6.8 installation des BRAISES VITRIFIÉES
- 6.9 mise en place du logo
- 7.0 branchement électrique
- 8.0 instructions de fonctionnement
- 9.0 réglages
- 10.0 Entretien
- 11.0 rechanges
- 12.0 accessOires
- 13.0 dépannage
- 14.0 garantie
17
W415-1285 / F / 12.21.16
EN
16.5_2A
Simple venting confi guration (only one 45° and 90°
elbow)
90°
90°
45°
V
1
H
1
H
4
90°
90°
H
3
H
2
V
2
90°
90°
45°
V
1
H
1
H
2
REQUIRED
VERTICAL RISE
IN INCHES
(MILLIMETERS) V
T
0
5
(1.5)
15
(4.6)
20
(6.1)
100 (2540)
50 (1270)
150 (3810)
12.5
(3.8)
57 (1447.8)
147 (3733.8)
10
(3.1)
0
2.5
(0.8)
5
(1.5)
7.5
(2.3)
10
(3.1)
12.5
(3.8)
15
(4.6)
40 (12.2)
10 (3.1)
20 (6.1)
30 (9.1)
17.5
(5.3)
20
(6.1)
39 (11.9)
REQUIRED
VERTICAL
RISE IN FEET
(METERS) V
T
HORIZONTAL VENT RUN PLUS OFFSET IN
FEET (METERS) H
T
HORIZONTAL VENT RUN PLUS
OFFSET IN FEET (METERS) H
T
(H
T
) > (V
T
)
For vent confi gurations requiring more than one 45° elbow and 90° elbow, the following formulas
apply:
Formula 1: H
T
< 4.2 V
T
Formula 2: H
T
+ V
T
< 24.75 feet (7.5m)
Example:
V
1
= 4 FT (1.2m)
V
2
= 1.5 FT (0.5m)
V
T
= V
1
+ V
2
= 4 FT (1.2m) + 1.5 FT (0.5m) = 5.5 FT (1.7m)
H
1
= 2 FT (0.6m)
H
2
= 1 FT (0.3m)
H
3
= 1 FT (0.3m)
H
4
= 1.5 FT (0.5m)
H
R
= H
1
+ H
2
+ H
3
+ H
4
= 2FT (0.6m) + 1FT (0.3m) + 1FT (0.3m) + 1.5FT (0.5m) = 5.5 FT (1.7m)
H
O
= .03 (one 45° elbow + four 90° elbows - 135°) = .03 (405 - 135°) = 8.1 FT (2.5m)
H
T
= H
R
+ H
O
= 5.5 FT (1.7m) + 8.1 FT (2.5m) = 13.6 FT (4.2m)
H
T
+ V
T
= 13.6 FT (4.2m) + 5.5 FT (1.7m) = 19.1 FT (5.8m)
Formula 1: H
T
< 4.2FT (1.3m) V
T
4.2FT (1.3m) V
T
= 4.2 FT (1.3m) x 5.5 FT (1.7m)= 23.1 FT (7m)
13.6 FT (4.2m) < 23.1 FT (7M)
Formula 2: H
T
+ V
T
< 24.75 FT (7.5m)
19.1 FT (5.8m) < 24.75 FT (7.5m)
Since both formulas are met, this vent confi guration is acceptable.
90°
90°
45°
V
1
H
1
H
4
90°
90°
H
3
H
2
V
2
90°
90°
45°
V
1
H
1
H
2
REQUIRED
VERTICAL RISE
IN INCHES
(MILLIMETERS) V
T
0
5
(1.5)
15
(4.6)
20
(6.1)
100 (2540)
50 (1270)
150 (3810)
12.5
(3.8)
57 (1447.8)
147 (3733.8)
10
(3.1)
0
2.5
(0.8)
5
(1.5)
7.5
(2.3)
10
(3.1)
12.5
(3.8)
15
(4.6)
40 (12.2)
10 (3.1)
20 (6.1)
30 (9.1)
17.5
(5.3)
20
(6.1)
39 (11.9)
REQUIRED
VERTICAL
RISE IN FEET
(METERS) V
T
HORIZONTAL VENT RUN PLUS OFFSET IN
FEET (METERS) H
T
HORIZONTAL VENT RUN PLUS
OFFSET IN FEET (METERS) H
T
90°
90°
45°
V
1
H
1
H
4
90°
90°
H
3
H
2
V
2
90°
90°
45°
V
1
H
1
H
2
REQUIRED
VERTICAL RISE
IN INCHES
(MILLIMETERS) V
T
0
5
(1.5)
15
(4.6)
20
(6.1)
100 (2540)
50 (1270)
150 (3810)
12.5
(3.8)
57 (1447.8)
147 (3733.8)
10
(3.1)
0
2.5
(0.8)
5
(1.5)
7.5
(2.3)
10
(3.1)
12.5
(3.8)
15
(4.6)
40 (12.2)
10 (3.1)
20 (6.1)
30 (9.1)
17.5
(5.3)
20
(6.1)
39 (11.9)
REQUIRED
VERTICAL
RISE IN FEET
(METERS) V
T
HORIZONTAL VENT RUN PLUS OFFSET IN
FEET (METERS) H
T
HORIZONTAL VENT RUN PLUS
OFFSET IN FEET (METERS) H
T
See graph to determine the required vertical
rise V
T
for the required horizontal run H
T
.
The shaded area within the lines represents acceptable values for H
T
and V
T










