Installation Manual
Table Of Contents
- W415-1285_Fe
- 1.0 installation overview
- 2.0 introduction
- 3.0 venting
- 4.0 installation
- 5.0 framing
- 6.0 Finishing
- 6.1 main SAFETY SCREEN removal / installation
- 6.2 end SAFETY SCREEN removal / installation (bhd4p only)
- 6.3 MAIN door removal / installation
- 6.4 END DOOR REMOVAL / installation (bhd4p only)
- 6.5 control panel removal
- 6.6 hearth pad installation
- 6.7 log placement
- 6.8 glass media installation
- 6.9 logo placement
- 7.0 wiring diagram
- 8.0 operating instructions
- 9.0 Adjustment
- 10.0 MAINTENANCE
- 11.0 replacements
- 12.0 accessories
- 13.0 troubleshooting
- 14.0 warranty
- 15.0 SERVICE HISTORY
- W415-1285_Ff
- 1.0 vue d'ensemble de l'installation
- 2.0 introduction
- 3.0 éVACUATION
- 3.1 LONGUEURS DES CONDUITS D’ÉVACUATION ET COMPOSANTS
- 3.2 INSTALLATIONS TYPIQUES D'ÉVENTS
- 3.3 INSTALLATIONS PARTICULIÈRES D'ÉVENTS
- 3.4 convertir l'Évacuation de 5/8" À 4/7"
- 3.5 EMPLACEMENTS ET DÉGAGEMENTS MINIMAUX DE LA TERMINAISON
- 3.6 CHARTE D'APPLICATION DES ÉVACUATIONS
- 3.7 LÉGENDE
- 3.8 VALEURS DU COUDE EN LONGUEURS D'ÉVENT
- 3.9 TERMINAISON HORIZONTALE
- 3.10 TERMINAISON VERTICALE
- 4.0 installation
- 5.0 ossature
- 6.0 Finitions
- 6.1 RETRAIT de l'écran de protection PRINCIPAL et l'installation
- 6.2 RETRAIT de l'écran de protection fin et l'installation (SEULEMENT bhd4p)
- 6.3 installation / enlèvement de la porte PRINCIPALE
- 6.4 Enlèvement DE LA PORTE D'EXTRÉMITÉ / INSTALLATION (SEULEMENT bhd4p)
- 6.5 enlèvement de PANNEAU DE CONTRÔLE
- 6.6 INSTALLATION des bases de protection (bHD4ST Et bHD4P SEULEMENT)
- 6.7 DISPOSITION DES BÛCHES
- 6.8 installation des BRAISES VITRIFIÉES
- 6.9 mise en place du logo
- 7.0 branchement électrique
- 8.0 instructions de fonctionnement
- 9.0 réglages
- 10.0 Entretien
- 11.0 rechanges
- 12.0 accessOires
- 13.0 dépannage
- 14.0 garantie
FR
W415-1285 / F / 12.21.16
83
90°
90°
45°
V
1
H
1
H
4
90°
90°
H
3
H
2
V
2
90°
90°
45°
V
1
H
1
H
2
COURSE
VERTICALE
REQUISE
EN POUNCES
(MILLIMETERS) V
T
0
5
(1.5)
15
(4.6)
20
(6.1)
100 (2540)
50 (1270)
150 (3810)
12.5
(3.8)
57 (1447.8)
147 (3733.8)
10
(3.1)
0
2.5
(0.8)
5
(1.5)
7.5
(2.3)
10
(3.1)
12.5
(3.8)
15
(4.6)
40 (12.2)
10 (3.1)
20 (6.1)
30 (9.1)
17.5
(5.3)
20
(6.1)
39 (11.9)
REQUIRED
VERTICAL
RISE IN FEET
(METERS) V
T
HORIZONTAL VENT RUN PLUS OFFSET IN
FEET (METERS) H
T
LONGUEUR DES COURSES HORIZONTALES
PLUS LES DÉVIATIONS EN PIEDS (MÉTRES) H
T
90°
90°
45°
V
1
H
1
H
4
90°
90°
H
3
H
2
V
2
90°
90°
45°
V
1
H
1
H
2
COURSE
VERTICALE
REQUISE
EN POUNCES
(MILLIMETERS) V
T
0
5
(1.5)
15
(4.6)
20
(6.1)
100 (2540)
50 (1270)
150 (3810)
12.5
(3.8)
57 (1447.8)
147 (3733.8)
10
(3.1)
0
2.5
(0.8)
5
(1.5)
7.5
(2.3)
10
(3.1)
12.5
(3.8)
15
(4.6)
40 (12.2)
10 (3.1)
20 (6.1)
30 (9.1)
17.5
(5.3)
20
(6.1)
39 (11.9)
REQUIRED
VERTICAL
RISE IN FEET
(METERS) V
T
HORIZONTAL VENT RUN PLUS OFFSET IN
FEET (METERS) H
T
LONGUEUR DES COURSES HORIZONTALES
PLUS LES DÉVIATIONS EN PIEDS (MÉTRES) H
T
16.5_2A
(H
T
) > (V
T
)
Lorsque la confi guration de l’évacuation exige plus d’un coude de 45° et 90°, les formules suivantes
s’appliquent :
Formule 1 : H
T
< 4,2 V
T
Formule 2 : H
T
+ V
T
< 24,75 pieds (7,5m)
Exemple :
V
1
= 4 PI (1,2m)
V
2
= 1,5 PI (0,5m)
V
T
= V
1
+ V
2
= 4 PI (1,2m) + 1,5 PI (0,5m) = 5,5 PI (1,7m)
H
1
= 2 PI (0,6m)
H
2
= 1 PI (0,3m)
H
3
= 1 PI (0,3m)
H
4
= 1,5 PI (0,5m)
H
R
= H
1
+ H
2
+ H
3
+ H
4
= 2 PI (0,6m) + 1 PI (0,3m) + 1 PI (0,3m) + 1,5 PI (0,5m) = 5,5 PI (1,7m)
H
O
= 0,03 (un coude 45º + quatre coudes 90º - 135 °) = 0,03 (405 - 135°) = 8,1 PI (2,5m)
H
T
= H
R
+ H
O
= 5,5 PI (1,7m) + 8,1 PI (2,5m) = 13,6 PI (4,2m)
H
T
+ V
T
= 13,6 PI (4,2m) + 5,5 PI (1,7m) = 19,1 PI (5,8m)
Formule 1 : H
T
< 4,2 V
T
4,2 V
T
= 4,2 PI (1,3m) x 5,5 PI (1,7m) = 23,1 PI (7m)
13,6 PI (4,2m) < 23,1 PI (7m)
Formule 2 : H
T
+ V
T
< 24,75 PI (7,5m)
19,1 PI (5,8m) < 24,75 PI (7,5m)
Puisque les deux formules sont respectées, cette confi guration d’évacuation est acceptable.
90°
90°
45°
V
1
H
1
H
4
90°
90°
H
3
H
2
V
2
90°
90°
45°
V
1
H
1
H
2
COURSE
VERTICALE
REQUISE
EN POUNCES
(MILLIMETERS) V
T
0
5
(1.5)
15
(4.6)
20
(6.1)
100 (2540)
50 (1270)
150 (3810)
12.5
(3.8)
57 (1447.8)
147 (3733.8)
10
(3.1)
0
2.5
(0.8)
5
(1.5)
7.5
(2.3)
10
(3.1)
12.5
(3.8)
15
(4.6)
40 (12.2)
10 (3.1)
20 (6.1)
30 (9.1)
17.5
(5.3)
20
(6.1)
39 (11.9)
REQUIRED
VERTICAL
RISE IN FEET
(METERS) V
T
HORIZONTAL VENT RUN PLUS OFFSET IN
FEET (METERS) H
T
LONGUEUR DES COURSES HORIZONTALES
PLUS LES DÉVIATIONS EN PIEDS (MÉTRES) H
T
Consultez le graphique pour déterminer la
course verticale nécessaire V
T
par rapport à la
course horizontale requise H
T
.
La section ombragée à l’intérieur des lignes
représente des valeurs acceptables pour H
T
et V
T
Confi guration d’évacuation simple (un coude de 45º et
de 90°seulement)










