Step 7. Place the Support Clamp
(provided with the Support Box) inside
the Support Box (at the bottom),
and secure to the Pipe Section.
The Clamp allows the Support Box
to support the weight of the Pipe
Sections. Continue to add Pipe
Sections until you are above the
rooine.
Step 8. Follow Steps 7 through
10 (page 15 & 16) of the Vertical
Installation Instructions.
Step 9. Install the black Trim Collar
around the outside of the Cathedral
Ceiling Support Box. The two pieces
of the Trim Collar slide over one
another to allow for easy adjustment
around the Support Box. Using the six
(6) screws provided, secure the four
corners and the overlapping sections
of the Trim Collar to the underside of
ceiling. You may want to pre-drill the
holes for the overlapped sections for
ease of installation (Fig. 22).