Installation Sheet

www.napoleongrills.com
15
EN
Gas Hook-Up Instrucons
Natural Gas Hook-Up
The gas appliance is designed to operate with natural gas at an inlet pressure of 7 inches water column.
The piping up to the appliance is the responsibility of the installer. A exible metal connector is included
to simplify the installaon of the appliance. Ensure that the connector does not pass through a wall, oor,
ceiling or paron, and is protected from damage. Do not use a hose to connect the appliance. The gas
supply pipe must be suciently sized to supply the BTU/h specied on the rang plate, based on the
length of the piping run.
Purge the gas supply line of any trapped air prior to the rst ring of the appliance.
WARNING!
Risk of re, explosion or asphyxiaon, ensure there are no ignion sources such as sparks or open
ames.
The installaon must be performed by a licensed gas er, and all connecons must be leak tested
before operang the appliance.
All gas connecons must be contained within the appliance when complete.
High pressure will damage the valve, disconnect gas supply piping before tesng gas line at test
pressures above 1/2 psig.
Connect the gas supply in accordance to local codes. In the absence of local codes, install to the
current CAN/CSA B149.1 Installaon Code in Canada or to the current Naonal Fuel Gas Code, ANSI
Z223.1/NFPA 54 in the United States
Leak test all the connecons by brushing on a soap and water soluon. These connecons can be
accessed by removing the burner. (See burner removal instrucons.)
GAS CONNECTION