TABLE 3.1-16.1 ECS WATER LOADING DATA LM-IO
DESCENT TANKS ASCENT TANKS
T Po PFI* PFN PF2 PFI PF2
°F PSIA PSIA PSIA PSIA PSIA PSIA
60 11,607
61 11,629
62 11,651.
63 11,674
64 11,695
65 11,718
66 11,741
67 11,763
68 11,785
69 11,808
70 11,830
71 11,852
72 11,875
73 11,897
74 11,919
75 11,942
76 11,964
77 11,986
78 12,009
79 12,031
80 12,053
22,212 39,245 39,501
22,254 39,321 39,587
22,306 39,396 39,671
22,340 39,472 "' 39,757
22,383 39,547 39,842
22,425 39,623 39,929
22,469 39,698 40,014
22,511 39,774 40,102
22,553 39,849 40,188
22,597 39,924 40.275
22,639 40,000 40,363
22,681 40,075 40,451
22,725 40,151 40,540
22,767 40,226 40,628
22,S09 40,302 40,71S
22,S53 40,377 40,807
22,895 40,453 40,897
_2,937 40,528 40,987
22,982 40,604 41,079
23,024 40,679 41,170
23,066 40,755 41,262
46,427 46,683
46,516 46,782
46,605 46,880
46,695 46,980
46,784 47,079
46,873 47,179
46,963 47,279
4'7,052 47,380
47,141 47,480
47,231 47,582
47,320 47,683
47,409 47,785
47,499 47,888
47,588 47,990
47,677 48,093
47,767 48,197
47,855 48,299
47,945 48,404
48,035 48,510
48,124 48,615
48,213 48,720
NOTE: 1.
2.
Po - Initial Gas Pressure Setting
P}I - Pressure Required when Loading 'Killer" Solution.
PFN - Pressure Required for D/S N. Final Fill.
PF2 Pressure Required After Partial Drain and Refill.
NASA- MSC
Primary Reading of PFI using 0-60 psia Transducers verified by GF 4501 P.
* PFI - GF 4501 P + HEAD if GF 4501 P low, increase to required pressure.
D/S Tank #i HEAD - 2.502 PSI
D/S Tank #2 HEAD - 3.372 PSI
3. Po, PFI*, PFN, PF2, PFI values as shown above, may have a tolerance of
(+) one (i) PCM Bit as read on CRT.
MID 1 Bit
GF 4501 P .I psia
GF 4500 P .24 psia
GP 0500 P .24 psia
GF 4502 P .24 psta
GF 4503 P .24 psia
4. This table provides nominal descent loading of 212 lb/tank and ascent tank
loading of 42.5 lb/tank.
3.1-132