user manual

TABLE 3.2-15
MISSION J-2
SERVICE MODULE RCS LOADING SUMMATION
Amendment 114
9/15/71
This table will be completed when loading is accomplished. For Mission
Planning, reference should be made to Section 4.2, for nominal load, loading
tolerances, and nominal deliverable propellants.
quad A (ib) quad B (ib)
Secondary Fuel
Primary Fuel
Total Fuel
Maximum Trapped
Nominal Deliverable
Secondary Fuel
Primary Fuel
Total Fuel
Maximum Trapped
Nominal Deliverable
Total Oxidizer
Maximum Trapped
Nominal Deliverable
Total Oxidizer
Maximum Trapped
Nominal Deliverable
Ruad C (ib)
Secondary Fuel
Primary Fuel
Total Fuel
Maximum Trapped
Nominal Deliverable
Total Oxidizer
Maximum Trapped
Nominal Deliverable
quad D (ib)
Secondary Fuel
Primary Fuel
Total Fuel
Maximum Tr@pped
Nominal Deliverable
Total Oxidizer
Maximum Trapped
Nominal Deliverable
Total Fuel
Maximum Trapped
Nominal Deliverable
Total SM/RCS Propellant Load (Ib)
Total Oxidizer
Maximum Trapped
Nominal Deliverable
3.2-103
SNA-8-D-027(III)REV 3