Installation Guide

Drop & Lock Glueless Floating Floor
Installation Instructions
3580 Corporate Dr. | Dalton, GA 30720 USA
Phone: 800-404-2675 | Fax: 706-733-8120 | www.usfloorsllc.com
ATTENTION! READ BEFORE INSTALLING!
COLOR VARIATION
This flooring is a natural product and color variations are to be expected. For best visual effect, shuffle planks from sever al
cartons and do not install boards varying greatly in color next to one another.
ACCLIMATION
As relative humidity varies in different parts of the country, acclimation of the flooring prior to installation is the most
important precaution to take in order to insure a successful installation. Proper acclimation is necessary to
adapt the
moisture content of the flooring to the conditions of your environment. Improper acclimation can cause the floor to buckle
and/or the boards to shrink or cup after installation.
SUBFLOOR PREPARATION
Subfloor must be level, dry and free of imperfections. An uneven subfloor will make the floor feel unstable and cause
premature damage.
Drop & Lock Glueless Floating Floor
Installation Instructions
READ THESE INSTRUCTIONS THOROUGHLY BEFORE BEGINNING INSTALLATION. IN ADDITION TO THESE
INSTRUCTIONS, WE RECOMMEND THAT THE INSTALLER FOLLOW ALL INSTALLATION GUIDELINES AS SET
FORTH BY THE NATIONAL WOOD FLOORING ASSOCIATION. If the following instructions leave any unanswered
questions or if additional information is required, please call USFloors/Natural Floors toll free at 800-404-2675 (706-733-
6120).
FLOORING MATERIAL SHOULD BE INSPECTED PRIOR TO INSTALLATION
Responsibility for the suitability of USFloors flooring and accompanying products for each indivi
dual installation
cannot be assumed by USFloors, since USFloors has no control over the installer’s proper application. Should
an individual plank be doubtful as to appearance or dimension the installer should not use this piece. USFloors
will send replacement in a timely fashion.
NOTE: USFloors Drop & Lock flooring may be installed with a direct glue-down method on approved wooden (or)
concrete substrates that are on (or) above grade only. Use only USFloors Wood and Bamboo Flooring Adhesive
(or) comparable moisture cured urethane adhesives (i.e. Bostik’s Best). Please consult with adhesive
manufacturer to determine if suitable for use with this material.
PRE-INSTALLATION JOBSITE REQUIREMENTS
USFloors cannot be held responsible for site conditions.
Carefully examine the flooring prior to installation for grade, color, finish and quality. Ensure adequate lighting for proper
inspection. If flooring is not acceptable, contact your supplier immediately and arrange for replacement. USFloors
cannot accept responsibility for flooring installed with visible defects. Prior to installation of any flooring, the installer must
ensure that the jobsite and subfloor meet the requirements of these instructions. USFloors is not responsible for flooring
failure resulting from unsatisfactory jobsite and/or subfloor conditions.
Flooring should be one of the last items installed in any new construction or remodel project. All work involving water or

Summary of content (6 pages)