Installation Guide

7-6 Connecting the System
LED Indicator
8. Explanation Operations
During operation, the LED indicator on
the body of the wind generator can
be used to check the operating status
of the system.
The indicator LED can light in solid or
ashing red, green and orange (red and
green).
only when the turbine is rst connected to the battery (with the capacitor
discharged) or at the moment the charged capacitor is short circuited by
the blade switch in the “Brake” position.
This manual is intended for individuals who have the knowledge and
technical skills needed to work with batteries and electrical wiring. If the
wind generator is used in an inappropriate conguration or wired
incorrectly, its use could cause a severe accident and damage the system,
including this product.
If you have any questions regarding the wind generator system
conguration, contact either the dealer where you purchased this product
or Shoot Power Customer Service for more information.
You have to connect 2 x 12V batteries in series to get a 24V group. When
the 24V groups are connected in parallel the total capacity is the sum of all
individual 24V group capacities. Please see batteries sub-section for more
details.
CAUTION
12V
-
+
+
-
Common
Brake
On
80A
-
+
Ground Rod
12V
-
+
-
+
Switch
“SPG”
Single
Point of
Ground
+
-
To other 24V sources (solar panels,
Ac battery charges, additional wind
turbines, etc.)
and Loads(inverters, etc.)
....
-
+
-
GND
Perimetral
Ground
48V Deep Cycle
AGM Battery Bank
Grounding
Jumper
GND
GND
WIND TURBINE 24V-2000W-GENERAL WIRING DIAGRAM
12V
12V
Power
Dump load
Dump load
Page 12 of 20