Operations and Maintenance Manual

Table Of Contents
VS300 Operations and Maintenance Manual Routine maintenance
Page 3-2 Issue 10.0 2019-01-18
Checking hardware
All hardware must be checked at least once a year. Nautel recommends more frequent
checking if the VS300 is subjected to above average thermal cycling, caused by turning the
VS300 on and off.
To prevent damaging the hardware, ensure that the proper size tools are used. In most
cases, hardware is metric.
A mounting surface or terminal that has changed colour indicates a loose hardware
connection.
Battery replacement
The VS300's exciter/control PWB contains a battery backup circuit that allows the time and
date to update during ac power failure. The battery should be replaced every 12 months. See
“Replacing the exciter/control PWB battery” on page 3-4.