Installation Manual

3
4
5
6
Repeat step 1 and step 2 to attach Horizontal Cross Bars(A)
to the other two Vertical Rails (C).
Attach two Casters (D) to each of the Bottom Support
Beams (B) using 4 M6 Screws (F) and 4 M6 Flange nuts (G)
for each Caster – NOTE: each support beam should have 1
Caster with Brake.
Attach Bottom Support Beams (B) to Frames using 8 M6 Screws (F)
and 8 M6 Flange Nuts (G).
Attach Top Support Beams (E) to Frames using 8 M6 Screws (F) and
8 M6 Flange Nuts (G).
D
B
E
E