User's Manual Part 3

ROI-S05750 INITIAL LINE UP
3-12
3.4 Antenna Orientation
After the initial setup has been completed, an antenna orientation will be
performed between two stations according to the procedures in Chart 3-6.
Chart 3-5 Antenna Orientation
Apparatus :
Digital Multimeter with test lead
s or X0818 NLite E Monitor
Wrench
Headset
Step Procedure
1 Connect the PC to the LCT port on the NLite E IDU using USB
cable, (see Fig. 3-2)
2 At each station, set “Maintenance1” from Maintenance in LCT
Menu,
LCT MENU
Alarm/Status
Equipment Setup
Inventory
AUX I/O
Maintenance
Provisioning
Metering
PMON(History)
Maintenance1
Maintenance2
Note: In Maintenance “On” condition, every external Alarm
outputs, excluding Maintenance/PS/CPU (IDU) ALM, are
masked and remote control can not be performed.
3 Click and select for the following control items in
“Maintenanc
e1”,
Note: Retain the present status for other control items.
Note: When the TX power control mode is set
to ATPC, set it to
MTPC and required level for the NLite E link on the
“Equipment Setup” and “Provisioning”.