User's Manual Part 4

ROI-S05750 INITIAL LINE UP
3-34
Chart 3-11 Meter Reading
Step Procedure
1 Connect the PC to the LCT port on the NLite E IDU using USB
cable, (see Fig. 3-2)
2 Enter Login name “Admin”, enter Admin password and press
the “Login” button,
3 Click “Metering” button in LCT Menu,
LCT MENU
Alarm/Status
Equipment Setup
Inventory
AUX I/O
Maintenance
Provisioning
Metering
PMON(History)
4 Then, the values of Metering items are displayed as follows:
1+1 Configuration
----Metering---
No.1 No.2
TX Power [dBm]*1 +19 +19
RX Level [dBm] -49.5 -49.7
Power Supply [V] *2 -45 -45
BER *3 0.0E-10 Calculating
1+0 Configuration
----Metering---
TX Power [dBm]*1 +19
RX Level [dBm] -50
Power Supply[V] *2 -45
BER *3 1.10E-10