iPasolink250 Installation and Commissioning Guide Document ID: 141-DOC000008-E
Installation and Commissioning Process Overview
The flowchart below shows the installation and commissioning process.
Understanding Installation Procedure
Installation procedure comprises of:
Receiving and unpacking the network element
Installing the chassis on the rack
Cabling of 48 V earthing cable and DC power supply cables.
Figure 1: Installation and Commissioning Process Flow