This appendix provides various forms to record system data and test results during the
commissioning process. These forms must be filled and completed as and when you complete
the tests during the network element commissioning process.
Site Verification Checklist
Table 1:
Site Verification Checklist
SI.No
Site Verification
Checkpoints
Status
(Yes/No)
Measurements (Mts)
Remarks
1
Is the Existing Rack
width in line with the
standard measurements
details (19", 21", 23 ")?
If yes, is there a
Clearance for equipment
with existing rack?
2
Can the existing room
accommodate new
Racks?
If no, has a
recommendation been
done to the Customer or
any alternative method
suggested?
Has the suggestions
/recommendations
recorded in the Remarks
Column?
3
Are the Rack and
equipments shipped to
site? Are these available
for installation and
commissioning.
Please provide the
flooring details
False flooring
Non False
flooring
4
Is the DC Power Cable
and the Ground Cable
extended till the Rack?
Appendix I
Recording Data and Test Results