manual
7 of 13
ISSUED: 11-16-11 SHEET #: 125-9265-2 02-24-12
Visit the Peerless Web Site at www.peerlessmounts.com For customer care call 1-800-865-2112.
7
Attach three horizontal rails assemblies onto vertical supports (A) using twenty-four 1/4-20 x 3.5" hex head screws
(J), 1/4" SAE washers (F) and 1/4-20 nylock nuts (K) as shown in detail 2. Make sure that horizontal rail
assemblies are level then tighten all 1/4-20 x 3.5" hex head screws (J). Place two tube caps (R) into tops of vertical
supports (A) as shown in detail 2. NOTE: horizontal rails must be secured using twenty-four 1/4-20 x 3.5” hex head
screws (J).
A
F
K
J
Y
A
J
J
DETAIL 2
R
CABLE MANAGEMENT
8
Run display cables though top and bottom
openings in vertical supports (A) as shown.
NOTE: Display cables can be covered using
18" mesh sleeve (M) before securing.
Display cables can be secured to horizontal
rails assemblies using cable ties (Q) as needed
through slots in horizontal rails (Y).
Q
DISPLAY CABLES
M
Y
BOTTOM
OPENING
TOP
OPENING
A
Y
SLOT