Planning Guide

Welcome to Site Planning for Express5800/320Fc systems 1-1
Chapter 1
Welcome to Site Planning for
Express5800/320Fc
-
For an overview of the information you need to know and of the tasks you need to
perform to prepare a site for an Express5800/320Fc system, see:
“Site Planning Overview” on page 1-1
“Site Planning for Fault-Tolerant Systems” on page 1-2
“Site Planning Checklist” on page 1-3
“System Documentation” on page 1-5
Site Planning Overview
Site planning for fault-tolerant systems includes:
Space planning
Provide adequate space for the system or cabinet and for a desk or table to
accommodate components outside a cabinet. Also provide enough space for
servicing the systems and components.
Purchasing an appropriate cabinet and monitor
If you do not purchase a monitor from NEC Corporation of America, provide a
monitor that meets the system’s requirements.
If you do not purchase the cabinet that NEC Corporation of America references,
provide a cabinet that meets the system’s requirements.
Electrical (AC) power planning
Provide electrical power sources that meet the system’s requirements, optionally
including the purchase of a qualified uninterruptible power supply (UPS).
Network and telephone line planning
Provide sufficient network and analog telephone lines.