User Manual
Table Of Contents
- Introduction:
- Product overview
- Preparing the installation
- Executing the installation
- Configuring the installation
- Integrating the installation with other systems
- Servicing the installation
- Troubleshooting
- Regulatory information
- About Nedap
- Blank Page
Page of 24 43 Manual FC-line
1.
2.
3.
4.
Physical installation: Mount the Buzzer PCB
During transport the Buzzer PCB is mounted in the transport position. During the installation the Buzzer PCB
must be placed in the working position. See the drawing below for instructions.
Remove screw (2x)
Remove PCB from transport position
Place PCB to working position
Place screw (2x)