Physical installation
Make sure the right locations of the holes are marked on the floor, according to the dimensions sketched
earlier in this document. Drill the holes.
Placing a gate close to a wall
If RF technology is to be used: always keep enough space to place a shielding afterwards. You will
only know whether you need shielding when you are configuring the system (for example when you
find too much interference during the configuration).
Then follow these steps to place the nuts.
Clean the hole.
Insert Hilti-hit.
Place the nut.
Hilti-hit and the nut are not included in the installation set.