User's Manual
- 12 -
6.4 PL Sync TAB
When the unit is combined with other units, it needs to be
synchronized. This can be switched on/off with unit synchroni-
zation (sync). With unit sync activated, the timing of all the units
will be such that the have no/minimum interference from each
other. The sync offset must be set depending on the connection
to the NCC. When the unit is connected to the master NCC this
offset is 0. When the unit is connected to the rst slave NCC this
offset must be set to 1, the second NCC to 2, third NCC to 3 etc.
There are two sync slots 0 and 1. It is free to select a value. Between
units with a different value one is 0 and the other 1, means they are
100% independent from each other even in an environment with
very strong coupling between antennas at large distances.
Remark: When unit sync is active and no sync is connected, the
buzzer and RF signal are switched off to prevent false alarms
in this and other units. When Unit sync is activated but no sync
signal is connected, the RED LED on the unit is on (D101). So
RED LED D101 on? No RF TX signal and alarm are given.
To synchronize the Nedap Retail sweep system with the X2 we
need to set the correct active phase. When a Nedap swept system is synchronized with the X2, all mux settings on the sweep
system must be set on 4. This gives phases A,B,C and D. When the sweep system is active in phase A and B the X2 must be
switched to the other free phases C and D.
This product only supports a sweep system(s) connected to/congured as the master NCC.
In default setting, all phases are switched to active (value 1). If a swept system is congured to work on phase 1, the chameleon
must have that phase inactive so value 0. In general when synchronizing a swept system with the chameleon, the phases must
be inverted from each other.
Synchronization of Nedap sweep systems other then NCC MK2 (P2) are not supported.