User's Manual

Unless otherwise specified in the contract or purchase order, the supplier shall be responsible for the quality of the
part as it is delivered to HP. The supplier shall be responsible for having controlled processes to ensure product is in
total compliance with this specification. Failing lots shall be subject to return or other supplier-corrective action.
In addition to visual inspections, the following minimal tests shall be performed on every finished goods (100%)
before shipping to HP/ODM sites/factories.
8. CHANGE NOTICE
During development or after tooling release, any design or process changes initiated by ODM supplier shall be
communicated to HP through email and approved by HP prior to implementation. The supplier must provide
adequate samples and reports to allow HP to verify the change.
9. PACKAGING/SHIPPING
Packaging shall sufficient to protect against damage or loss during shipment from the supplier to destination
specified in the purchase order. Packaging, identification, and palletization shall be in accordance with HP
Document 109893 (Appendix A).
It shall be clearly marked with Supplier part number, HP part number, and a Revision number.
APPENDIX A
HP SUPPLIER PACKAGING/MATERIAL HANDLING SPECIFICATION