Maintenance Guide

Installing the Antenna
Follow this procedure to install the antenna.
1. Insert the antenna cable and housing through the 1-3/4 inch hole in the meter pit lid.
Figure 28 – Inserting the Antenna into the Pit Lid
2. Thread the locking nut onto the antenna, with the unthreaded end toward the lid.
Figure 29 – Locking the Nut on the Antenna
Figure 30 – Antenna Installation Complete
26 Cellular MIU (CMIU™) Pit and Wall Installation and Maintenance Guide
Chapter 5: Pit Installation