User Manual

Table Of Contents
Tools and Materials
Table 5 on page 7 and Table 6 on page 8 show the recommended
tools and materials you need to successfully install the L900
MIU.
Some items may not apply to your specific installation, or the
list may not contain all required tools or materials.
Site Selection
Always follow your company's safety practices and
installation guidelines when installing an L900 MIU. Never
perform an installation during a lightening storm or under
excessively wet conditions.
Installation and operation in moderate temperatures increase
reliability and product life. See "L900 MIU Pit Environmental
Conditions" on page4.
Follow these guidelines when selecting a location to install the
L900 MIU.
l For best results, select a location where there is no chance that
another object can be set over the antenna.
l Avoid installing the L900 MIU behind metal fences or walls.
l Make sure the pit location gives adequate room for installing
both the L900 MIU and the pit antenna.
For maximum performance, the flange of the pit antenna
needs to be located above the pit lid.
l For maximum performance, Neptune recommends that pit
antennas be installed above the lid as illustrated in Figure 11.
Figure 11 – Antenna Placement for Low Traffic Areas
14 L900 MIU Pit Installation and Maintenance Guide
Chapter 4: Pit Installation