User Manual
Table Of Contents
- 72126503 - Exhibit Cover
- For FCC_IM_L900 Pit_09262017
- L900™ MIU Pit Installation and Maintenance Guide
- Copyright
- Chapter 1: Product Description
- Chapter 2: L900 Specifications
- Chapter 3: General Installation Guidelines
- Chapter 4: Pit Installation
- Chapter 5: Data Logging Extraction
- Chapter 6: Maintenance and Troubleshooting
- Chapter 7: Contact Information
- Glossary
- Index
- Neptune Locations
Select a location for the L900 MIU that meets the
recommendations in "Site Selection" on page14.
Installing the Antenna
Figure 13 – Inserting the Antenna
into the Pit Lid
1. Insert the antenna cable and housing through the 1¾-
inch hole in the meter pit lid. See Figure 13.
Figure 14 – Locking Nut on Antenna
2. Thread the locking nut onto the antenna (unthreaded
end towards lid). See Figure 14.
Figure 15 – Securing the Locking Nut
3. Hand tighten the nut securely to the lid. See Figure 15.
16 L900 MIU Pit Installation and Maintenance Guide
Chapter 4: Pit Installation