User Manual
Table Of Contents
- 72126503 - Exhibit Cover
- For FCC_IM_L900 Pit_09262017
- L900™ MIU Pit Installation and Maintenance Guide
- Copyright
- Chapter 1: Product Description
- Chapter 2: L900 Specifications
- Chapter 3: General Installation Guidelines
- Chapter 4: Pit Installation
- Chapter 5: Data Logging Extraction
- Chapter 6: Maintenance and Troubleshooting
- Chapter 7: Contact Information
- Glossary
- Index
- Neptune Locations
M
main housing
Main body of the L900 MIU that attaches to the mounting adapter.
main housing fastener screw
Set screw (Hi-Lo fastener) that holds the main housing to the mounting adapter.
maximum cable length
Length set by the manufacturer for the wire between the encoder and the remote receptacle.
The specifications for this length are based on a solid 3-conductor wire.
MIU
See L900 MIU.
N
Novaguard sealant
Moisture protection compound.
P
potting
Covering of an electronic or electrical device to protect it from the surrounding environment.
R
register read time
Default time for all registers is 15 minutes. Custom time is not available.
40 L900 MIU Pit Installation and Maintenance Guide
Glossary