User's Guide

24 of 64
CBRS Survey UE User Guide
UG01287 v0.6 December 1, 2020
PoE-03 power supply
Use the PoE-03 power supply to power your CBRS Survey UE:
1 Connect the Antenna Power Supply (POE-03) to a dedicated AC power outlet away from running water,
steam and excessive heat. Switch the outlet ON if required.
2 Plug the end of the R45 Ethernet cable that does not have the weather-sealed plug into the R45 socket
named WALL on the PoE-03.
3 Fasten the end of the R45 Ethernet cable that has the weather-sealed plug into the antenna power supply
port on the back of the antenna as per instructions in steps 11, 12 and 13 in the previous section.
4 The lights on the POE-03 injector housing will indicate whether the power supply is connected using its LED
indicator lights. When the POWER LED is red and ANTENNA LED is green, the CBRS Survey UE is correctly
powered and connected.
PoE-03 LED indicators
The table below describes the status of the POWER and ANTENNA LEDs on the PoE injector.
LED
S t a t u s
D e s c r i p t i o n
POWER
Solid red
Antenna power supply is connected to AC power.
ANTENNA
Solid green
Antenna power supply is connected to AC power and the PoE port is connected
to the CBRS Survey UE.
Table 3 - POE-02 LED indicators