Informational text fields for Serving Cell and Test start time are shown.
The installer can run a speed test by clicking the Run Speed Test.
When the Speed Test button is selected, the device will attempt three cycles of each download and upload,
updating status, progress and throughput as the test progresses.
If the installer wishes to go back to the previous screen, they make click “Back”.
If the device is not mounted*, then the prompt is shown for “Mount Unit”.
If the device was not mounted* then the installer is shown a “Finish Installation” button.
In case the Speed Test does not meet expectations as installed, there will be a button to “Move to new Location”.
*The Installation Flow will track whether the installer has gone through the Mount Unit flow.
Mount installation
Status fields are provided for:
CBRS Registration Status (Not Registered, Registering, Registered)
Serving cell
Figure 30 - Mount Installation screen
Upon entering the screen, the device will attempt CBRS Deregistration.
The installer will be prompted to enter the Mount Type [Roof top/Wall mount/pole Mount (selection/check box)]
If Deregistration is successful (or the deregistration times out), then the screen will be updated to show “It is now
safe to remove the Smart Antenna Tool and mount OA”.
The installer will power down the Smart Antenna Tool while the OA mount is installed.
After mount is in place, the installer will power on the Smart Antenna Tool and progress the screens through the
Network Scan page.
Installer shall aim the OA at the desired location and loosely tighten all mounting bracket bolts.
Once the Speed Test is performed, the installer will finalize the installation.