Installation Guide

Level
Left and Right Corner Post Assembly
There are Left and Right corner assemblies (2 each) as shown aside:
The assembly process is very similar, the only diference between
the two is which post the second trellis assembly is attached to.
(The left or right side of the assembly)
Place the panel with trellis onto the steel mounting plate
followed by the short post as shown.
Place a trellis assembly between the posts as shown. The trellis
assemblies should be at the same height. A level should be used
to ensure the two trellis assemblies are level.
Fasten the trellis assembly onto the posts with eight, 1-1/2”
screws though the pre-drilled holes onto posts (four per side).
Make sure the trellis assembly is straight and level along the post.
Pressure fit three post caps per corner assembly as shown.
1
2
STEP THREE
3
9
Left Corner Post Assembly Right Corner Post Assembly
1
2
4
1
2
3
3
4
4
Level