Install Instructions

3
Table of Contents
I. Pre-Installation ............................... 3
II. Unpack Boiler ................................ 5
III. Steam Piping and Trim ................... 5
IV. Gas Piping ...................................... 8
V. Venting ......................................... 10
VI. Electrical ....................................... 13
VII. System Start-up ............................ 16
VIII. Service ......................................... 21
IX. Repair Parts .................................. 27
Warranty ........................ Back Cover
I. Pre-Installation
WARNING
Carefully read all instructions before installing
boiler. Failure to follow all instructions in proper
order can cause personal injury or death.
A. Inspect shipment carefully for any signs of damage.
All equipment is carefully manufactured, inspected
and packed. Our responsibility ceases upon delivery
of boiler to carrier in good condition. Any claim
for damage or shortage in shipment must be led
immediately against carrier by consignee. No claims
for variances or shortages will be allowed by Boiler
Manufacturer, unless presented within sixty (60) days
after receipt of equipment.
B. Installation must conform to the requirements of the
authority having jurisdiction. In the absence of such
requirements, installation must conform to National
Fuel Gas Code, NFPA 54/ANSI Z223.1 Where required
by the authority having jurisdiction, the installation
must conform to the Standard for Controls and Safety
Devices for Automatically Fired Boilers, ANSI/ASME
CSD-1.
C. Boiler is design certied for installation on
noncombustible ooring only. For installation on
combustible ooring only when installed on special
base listed in Table 2. The boiler must not be installed
on carpeting.
D. Provide clearance between boiler jacket and
combustible material in accordance with local re
ordinance. Refer to Figure 2 for minimum clearance
from combustible material for alcove installation.
Table 2: Special Base for Installation on
Combustible Flooring
Figure 2: Minimum Clearances to Combustible
Construction for Alcove Installation
Boiler Model Special Base Part Number
30 61812036
40 61812046
50 61812056
60 61812066
70 61812076
80 61812086