48” WORKBENCH 72” WORKBENCH 96” WORKBENCH Workbench Series Warning: Excessive weight hazard! Use two or more people to move, assemble or install workbench. Failure to do so can result in back or other injury. For assistance, call 1.877.306.8930; for UK 0800.031.4069; e-mail at info@newageproducts.
Parts List LONG CROSS BEAM WORKTOP LONG SUPPORT BEAM FOR 96” BENCH TOOL TRAY SHORT SUPPORT BEAM TOOL TRAY DIVIDERS LEG (A) SHORT CROSS BEAM LEG (B) 9/16” X 5/8” HEX BOLTS 9/16” LOCK WASHERS #8-32 X 7/8” BOLTS #8-32 LOCK WASHERS AND NUTS ADJUSTABLE FEET #8-32 X 3/4” SCREWS #8-32 X 1” SCREWS
Tools Needed 1 x 9/16” Socket driver wrench 1 x 12” Magnetic Leveler 1 x #2 Phillips Bit Screwdriver 1 x Pliers 1 x Tape Measure 1 x Pencil Parts and Hardware Supplied Parts 48” Workbench 72” Workbench 96” Workbench Threaded Adjustable Foot 4 4 4 Long Cross Beam 2 2 2 Long Support Beam 0 0 1 Short Cross Beam 2 2 2 Short Support Beam 2 2 2 Leg (A) 2 2 2 Leg (B) 2 2 2 9/16” x 5/8”L Hex Bolts 32 32 36 9/16” Lock Washers 32 32 36 #8 x 3/4” Wood Screws 12 12 12 #
Assemble The Frame 1. Select one Leg (A) and one Leg (B) and lay them opposite one another on the floor with the leg brackets positioned on the outside of the two legs, and facing in the same direction. See Figure 1. 2. Select one Short Cross Beam, and one Short Support Beam, and bolt the side frame assembly together with the supplied 9/16” hex bolts and lock washers. See Figure 1. Note: Legs are shown being assembled upside down, as this will be easiest for assembly and installing the top. 5.
Mounting The Tool Tray 1. For Stainless Steel Top: Install (4) #8 x 1” screws in the locator holes along the edge of the worktop, 3/4 of the way in. Installing Bamboo Top Tray 1 Fig.1 WORKTOP For Bamboo Top: Place tray flush with the top of worktop (Figure 1) and use the tray as a guide to mark the center of the top of the keyholes for the 4 screw locations along the edge. (Figure 2) + MARK CENTER HERE KEYHOLE ON TRAY 2. Slide the keyholes on the side of the tray over the heads of the screws. 2 3.
Mounting Power Bar 1. Insert the two #8-32 bolts into the slots on the back of the power bar. Secure the screws in the lower gap towards the cord. 2.Install the power bar onto the workbench by inserting the two screws through the corresponding holes on the front, or sides of the workbench. 1 2 If installing the power bar on the front of the workbench you can feed the cord for the power bar through the rubber grommets on the front and back of the workbench. 3.
NEWAGE PRODUCTS INC. WELDED WORKBENCH 10 YEAR LIMITED MANUFACTURER WARRANTY When this product is installed, operated and maintained according to the instructions attached to or furnished with the product, NewAge Products Inc. will replace the defective product or parts if the part fails as a result of defective materials or workmanship for a period of ten years from the date of purchase. NEWAGE PRODUCTS INC. WILL NOT PAY FOR: 1.