Instructions / Assembly

NOTE: Make sure all shelf tabs are completely in place, see
below diagram.
5. Repeat steps 2 – 4 for the remaining shelves.
6. Follow the same process for the Closet Rod by placing the two
closet rod brackets on opposite sides (left and right) of the locker,
and securing them to the side tabs. Then rest the long closet rod
on the two brackets. See diagram.
WALL AND LOCKER CABINET WALL MOUNTING INTO
DRYWALL / STUDDED WALL:
1. Using a stud nder locate the studs in the wall where the wall
cabinet is to be placed.
2. Once studs are located, using a pencil and a level mark a vertical
line to indicate stud location.
3. Place the cabinet into position tight against the supporting wall.
4. Open the doors and locate the perforated mounting strip on the
top and bottom of the backside of the cabinet. Note: the wall
cabinet has a perforated strip of holes at the top and bottom of
the cabinet, the locker only has a perforated strip at the top of
the cabinet.
5. Align the previously marked stud lines with a perforated hole by
shifting the cabinet slightly.
6. Place a small magnetic level on top of the wall cabinet and adjust
the orientation of the cabinet to bring it to a level position.
7. Once leveled, using the supplied mounting hardware fasten a
2.5” x ¼” cabinet mounting lag bolt with a large washer through
the cabinet and into the stud. This can be done by hand with a
7/16” socket wrench or a cordless power drill with a 7/16” socket
attachment. Do not over tighten bolts! Once the fender is sitting
tightly ush with the backside of the cabinet stop.
8. Repeat Step 6 three additional times with the remaining
mounting hardware to install the wall cabinet.
WALL AND LOCKER CABINET WALL MOUNTING INTO
CONCRETE BLOCK / MASONRY WALL:
NOTE: Masonry Hardware NOT Included
REQUIRED HARDWARE:
• 2 ¼” x ¼” Tapcon Concrete Anchor (4)
0r
•#10 x 2” Screw with 3/16” masonry plug (4)
1. Place the wall cabinet into position tight against the supporting
wall.
2. Open the doors and locate the perforated mounting strip on the
top and bottom of the backside of the cabinet.
3. Place a small magnetic level on top of the wall cabinet and adjust
the orientation of the cabinet to bring it to a level position.
4. Using a hammer drill, drill 4 pilot holes through the perforated
strip in the backside of the cabinet and through the wall.
5. Using either the 2 ¼” x ¼” Tapcon Concrete Anchor or #10 x 2”
Screw with 3/16” masonry plug method and the supplied fender
washers fasten the cabinet directly to the wall. This application
requires a cordless power dill with a #2 Philips bit for ease of
installation.
6. Repeat Step 3 - 4 three additional times with the remaining
mounting hardware.
THANK YOU for purchasing a NewAge Product.
Please give us a call, or visit us online if you have any other questions
or comments.
INSTALL INSTRUCTIONS
NEWAGE STEEL CABINETRY
need more information? try, WWW.NEWAGEPRODUCTS.COM or 1 877 306 8930 for answers to commonly asked questions.