How to Guide

25
D
Fastening to Engineered Joists
If the construction of your ceiling is using engineered ceiling joists you must install an additional ceiling joist
(minimum 2” x 8”) perpendicular between two of the engineered ceiling joists.
Install two additional wooden ceiling joists in the required locations for your ceiling mounting angles depending on
the Wall Mounted Shelf size and orientation as determined on page 10 (ceiling joist and hardware not included)
If the spacing of your wall studs do not match
the desired size and direction of your Wall
Mounted Shelf installation, you will need to
install a horizontal support brace in the correct
position (minimum 2” x 8”).
Install an additional horizontal support
brace in the required locations for your wall
mounting depending on the Wall Mounted
Shelf and orientation as determined on page
10 (ceiling joist and hardware not included)
Warning:
Engineered ceiling joists are not suitable for directly fastening the ceiling mounting angles to.