Use and Care Guide
13
Installation Options
• Ensure you have followed the recommended steps on page 10.
• Install the wall panels before installing the NewAge Stone Composite Flooring.
• Once your wall panels have been installed and your space has been prepared, measure 3/8”
from your Installed wall panels and rst tile or plank.
The 3/8” gap will need to remain as your expansion gap along the perimeter of the room.
• 3/8” should also provide enough space to install the Silver nishing strips at the end.
Read the instructions for Installing the Silver Finishing Strips on page 19-21 before starting.
• If you are not installing the Silver Finishing Strips, keep a 3/8” expansion gap between your
wall panels and tile or plank .
• Customers have the option of installing their own nishing strips, baseboards and quarter
rounds as long as there is at least a 3/8” expansion gap.
• Ensure you have followed the recommended steps on page 10.
• Once your space has been prepared , measure 3/8” from your wall and rst tile / plank. The
3/8” gap will need to remain as your expansion gap along the perimeter of the room.
• 3/8” should also provide enough space to install the Silver Finishing Strips at the end. Read
the instructions for Installing the Silver Finishing Strips on page 19-21 before starting.
• If you are not installing the Silver Finishing Strips, keep a 3/8” expansion gap between your
wall and tile or plank
• Customers have the option of isntalling their own nishing strips, baseboards and quarter
rounds as long as there is at least a 3/8” expansion gap.
Option 1 : Installing Wall Panels and NewAge Garage Flooring
Option 2 : Installing NewAge Garage Flooring only
3/8”
3/8”